Do you know the tank hydraulic jacking system?Understand it?Do you know how it jacked up the tank?And do you know how much weight it can lift? Although hydraulic jacking system have been widely used in the construction of large tanks, many people still know little about them. Today I will give you a good introduction to the hydraulic jacking system from the following aspects.
●What is the hydraulic jacking system?
●How does the hydraulic jacking system lift the tank?
●How much weight can the hydraulic jacking system lift?
Hydraulic jacking system is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank.
At present, we have three types of hydraulic jacking system in WINCOO Engineering Co., LTD. They are the following three: Advanced hydraulic jacking system, Simple unfixing Holding -latch hydraulic Jacking system and Simple chain type hydraulic jacking system.
Hydraulic jacking system (package unit) is evenly distributed around tank inner wall. Tank top and upper (the first layer) wall plates are lifted first and then install and weld wall plates of tank body. Self locking hydraulic jacking system and hydraulic hoist composing of lifting frame and lifting rod are adopted. When oil enters hydraulic jacking system, upper clamp fastens and lifts lifting rod and expansion ring and mobilize tank (including tank top) to ascend upward. When oil returns to jack, upper clamp returns with piston and lower clamp automatically fastens lifting rod without gliding. The jack repeats the movement and make lifting rod ascend with tank to designated height (spare height for next layer of plate). After butt weld of next layer of wall plates, open upper and lower loosening device and loosen upper and lower clamp to make lifting rod and expansion ring descend to lower expanded and welded rib plate of the next layer of wall plates and then lift. Repeat the process and ascend welded tan till the last layer of wall plates are installed and welded. The installation of the whole storage tank is completed.
1.The number of hydraulic cylinders used for the same size tank is different according to the actual use and weight of the tank.
2.Regardless of tank size, hydraulic cylinder installation must be evenly distributed.
3.Construction of different tanks and selection of YT series hydraulic lifting equipment number and calculation of lifting equipment load rate specification: lifting equipment load rate must be less than 80%.
For example, for a storage tank with a volume of 50,00m3 and a diameter of 60m, the maximum weight of the lifting body of the tank is 536T (excluding the weight of the bottom plate of the tank), 40 hydraulic cylinders of YT25-2700 are selected, and the output force of each hydraulic cylinder is 250KN, so the total output force of the lifting device is 25O×40=10000KN.The load rate of the lifting equipment is 536x9.8÷10000×100%≈52.53%, which meets the requirement of less than 70%.
The above is our brief introduction to the hydraulic jacking system. If you have any questions, you are welcome to browse other relevant articles and products on our website. I hope the above content will be helpful to you.
Hydraulic jack is mainly used in the inverted construction of vertical cylindrical steel storage tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature storage tank, etc. Today I will introduce our YT series hydraulic jack, and take the YT30 for example. I will introduce this product in the following aspect.
●The features of equipment
●The structure of equipment
●The overall structure of the equipment and its working principle
1.The set of equipment is mainly composed of hydraulic lifting pump station, hydraulic cylinder, wire rope and so on, easy to install.
2.The equipment adopts PLC program to control the lifting centrally. Each lifting pump station is equipped with displacement sensor device, which is easy to operate and has high lifting synchronization accuracy.The equidistant distance can be adjusted arbitrarily.
3.The hydraulic lifting pump station can be divided into two modes: dynamic and centralized control. The hydraulic cylinder can be adjusted (fine-tuning) rising and falling individually or locally (several), and can be controlled centrally by multiple groups. The lifting height can be more accurately controlled, which is convenient for the butt adjustment of the welding seam of the tank wall.
4.Each hydraulic cylinder is equipped with safety valve, good self-locking,equipment will not be due to power failure in the process of operation;
5.The blasting and breaking of a high-pressure rubber hose.The failure of a hydraulic cylinder causes the tank or heavy weight to slide or fall, and the hydraulic lifting process is safe and reliable.
6.The stroke of hydraulic cylinder is 3200mm, which can meet the one-time lifting completion of the existing panel width and reduce the lifting time.
7.The overall base length of the equipment is only 2200mm, which can fully meet the automatic welding process of large storage tank inner ring seam.
Electrical control system: power supply part, control part (operating platform) and pump station control box.
![]() | ![]() | ![]() | ![]() |
Centralized control | Control panel | Power supply | Pump station control box |
The equipment consists of five parts;It is composed of power supply part, control part, hydraulic station part and pipeline part
● The power supply part provides power supply for the control part, and the hydraulic station provides power supply.
● The control part provides control for hydraulic station and hydraulic jack
● Hydraulic station: it is composed of oil pump electric unit, hydraulic valve set, high-pressure ball valve, high-pressure rubber hose and oil tank to provide hydraulic energy for hydraulic jack.
● Hydraulic jack part: hydraulic cylinder, wire rope, such as equaling rod device, hydraulic cylinder roof device, hydraulic cylinder support rod, etc
● The fixed plate, wire rope lifting lug and pin for the hydraulic cylinder are made by the user.
1).The set of equipment is evenly placed around the lifting object, the overall force and lateral force of the equipment are strictly calculated and successfully applied.
2).Precise and compact structure, adjustable output force, lifting speed to meet lifting requirements, high synchronization accuracy.
Force transfer process:
Output force of hydraulic cylinder → steel wire rope → rising ring (welded with lifting lug) → conduction plate → wall plate lifting
Hydraulic jacking system is mainly used in large tank construction. WINCOO ENGINEERING CO.,LTD is supplying tank hydraulic jacking system to tank contractors worldwide.
YT series hydraulic tank jacks is a set of large-scale equipment specially developed by our company for the national crude oil reserve project, which is suitable for the inversion welding engineering of giant steel cylinder tank.
This type of equipment is single-acting two-stage hydraulic cylinder (hydraulic jack), used for vertical take-off and landing work, return need external force or self-weight back, can’t be used for horizontal work.The equipment has strict and compact structure, safe and stable, easy operation, adjustable load, quick installation and high synchronization accuracy.
●The oil box
●The hydraulic system
●The hydraulic cylinder
The oil tank is a closed type box with hydraulic oil to provide oil source for the equipment.
1.Liquid level meter shows the oil level and liquid temperature in the box.
2.The air filter has the function of protecting and purifying the gas of hydraulic oil.
3.The lifting lug is used for equipment lifting.
Hydraulic system is the power source of the whole hydraulic lifting equipment, first with the motor todrive the piston pump, and then the mechanical energy of the pump into pressure energy, through the pressure valve (relief valve), direction valve (solenoid valve), sent to the actuator (hydraulic cylinder), and finally converted into mechanical energy to drive the load.
1.Protective cover can be disassembled, it mainly protect all parts under the protective cover .
2.Electromagnetic directional valve through the electromagnet with electricity and no electricity to complete the lifting action of the hydraulic cylinder.
3.The relief valve can control the pressure of the system to maintain constant by adjusting the handle of the relief valve, and realize the function of regulating, stabilizing or limiting the pressure.The set of equipment relief valve setting range (0-31.5mpa).
4.Pressure gauge shows the system pressure value.
5.The high-pressure ball valve makes the hydraulic oil flow or cut-off in the system. The valve mainly plays a safety protection role in this set of equipment.. It prevents the internal leakage of the hydraulic valve from affecting the operation of the hydraulic cylinder's descending equipment. Hydraulic fluid flow or cut-off is controlled by rotating high pressure ball valve handle.
1.Hydraulic cylinder is the actuator, rated output force is 250kN.
2.The hydraulic cylinder roof device is the force fulcrum of the piston rod end of the hydraulic Cylinder. In the process of lifting the tank, to prevent the damage of the hydraulic cylinder caused by the bending of the piston rod, or even failure and safety accidents.
3.Adjust the jacking bolt to adjust the gap between the hydraulic cylinder bracket and the tank wall, and tighten the bracket in the process of lifting the tank.
4.The hydraulic cylinder support regulating rod can mainly meet the requirements of resistance to class 5 wind load and tank partial load during the tank lifting process. It can also assist in adjusting the gap between hydraulic cylinder bracket and tank wall when rising circle falls back.
5.The equipment adopts PLC equalization system with automatic and manual modes.And the man-machine control interface is set on the control cabinet.The displacement sensor transmits signals to adjust the equipment at the same height
6.The working principle of the displacement sensor: because the wire rope is wound on a pulley built into the sensor, and the other end of the sensor has been connected to the mechanical movement, which is equipped with a display, so when the wire rope is pulled, the mechanical movement can be converted into electrical signals, so as to get the required data.
7.Unidirectional explosion-proof valve is a safety valve that allows the hydraulic cylinder to self-lock.In the process of being lifted or in the process of hanging the tank, the tank will not slide or fall because of the sudden explosion of the high-pressure hose, blurting, sudden power failure, etc.
WINCOO Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipment for client, fabricators, EPC/C companies on pipe fabrication,tank construction, pipeline construction ,industrial production lines, clean energy project and other industrial field.
Products are widely used in aviation, aerospace, electric power, metallurgy,nuclear power, ships, automobiles, construction machinery, lifting and transportation machinery, machine tools, plastics, chemical industry, paper making,packaging, printing, rubber, textile, printing and dyeing, cement, medicine, food, oil,mining, fire, construction, military and other fields;And for the major design institute(such as: iron and steel design institute, electric power design institute, chemical design institute, etc.) to provide quality technical support and service.
We are halfway through 2022, and we sold nearly 200 hydraulic lifting machine in the first half of the year, so we are looking forward to the sales expectations of hydraulic lifting machine in the second half of the year.
Projects already under discussion
Regular customers from the past
New customers via online platforms such as Google Stand alone
The largest hydraulic lifting machine project we are talking about is 40 hydraulic lifting machine and 10 tank welders that the salesman is talking about. After the unremitting efforts of colleagues and the support of technical staff, the customer has placed an order to us, the hydraulic lifting machine is in an orderly production.
Regular customers from the past
According to our past experience, our old customers will place orders with us again. Because most of our customers are professional tank contractors, each year will undertake a considerable number of tank construction projects. Hydraulic lifting machine is an inevitable machine used in tank construction, in order to save labor costs and protect the safety of staff. We promise to serve our customers with our best attitude and product quality. What we do most is always repeat business
New customers via online platforms such as Google Stand alone
Due to objective reasons such as the epidemic situation, we cannot visit customers abroad as we did before, and customers cannot conveniently visit factories in China. Therefore, we have developed more ways to develop and contact customers, such as Google Independent website, Alibaba International website, Made in China and other online platforms, so that customers around the world can see and understand our products online anytime and anywhere. Through these channels, we have come into contact with many new customers. I believe that customers will see and trust us through our professional ability and quality products.
WINCOO ENGINEERING CO., LTD has ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour costs and higher efficiency construction/fabrication method and better quality during phase of project bidding.
Pipe spool fabrication line refers to the manufacturing (cutting, chamfering, welding) of metal pipes and elbows to manufacture pipelines or pipeline structures, which are commonly used in the oil and gas industry and offshore industries. The pipe spool fabrication line actually prepares all the tube ends from the manufacturing tube to the tube and from the tube to the elbow. Next, describe in detail what is the pipe spool fabrication line?
Here is the content list:
l What are the performance characteristics of the Pipe spool fabrication line?
l What is the industry standard for pipe spool fabrication line?
l What is the specific solution for Pipe spool fabrication line?
The first thing to understand is that most pipe spool fabrication lines are manufactured in tube shaft manufacturing workshops where there are cutting, sawing, beveling and welding machinery. WINCOO provides a full range of pipe spool fabrication solutions, pipe beveling machines for pipe shaft production lines and automatic devices for GMAW pipe welding.
① Gathering pipeline system
② Multiple sets of pipe cutting and bevel processing workstations
③ Multiple sets of mechanical pipeline assembly workstations
④ Multiple sets of pipeline automatic welding workstations
⑤ Establish more logistics transportation system or transportation system
⑥ One set of steel pipe frame
① Production efficiency: extremely high (hoisting by bridge crane, beveling by high-speed pipe cutting and beveling machine, and welding by automatic welding station)
② Applicable industries: petroleum, natural gas, oil refineries, petrochemicals, onshore and offshore, chemical engineering, nuclear power plants, shipbuilding, power stations, energy, aviation. It is especially suitable for the on-site tube shaft production line prefabrication system.
③ Production capacity: 20,000~150,000 DI per month (or depending on the size of the archive or the configuration of the machine), which reduces the manpower input, improves the level and efficiency of the pipe spool fabrication line, and saves more costs.
Input voltage | 380V50HZ | pipe diameter | DN150-600 |
rated power
| 3 kW | wall thickness | 6-50 mm |
Application materials
| Carbon steel, stainless steel, alloy steel | suitable length | 200 mm to 12000 mm |
range
| Tube Pipe elbow Pipe flange Pipe tee | reorganization | electric |
Oscillation | electric | ||
Before and after walking | electric | ||
Rotating flange | electric | ||
support system
| Railcar, two cars, 7.5m track, carrying capacity: <= 6T | ||
Efficiency team | 400-600 inches in diameter / 10 hours |
In addition, WINCOO also provides fixed mechanical equipment to prepare pipe ends with smooth and accurate chamfering to prepare for welding before manually or automatically welding pipe to pipe or bending pipe. We can provide you with a suggested tool set to get the correct pipe spool fabrication line!
In addition to the production of pipe spool fabrication line, WINCOO also produces pipe benders, roll grooving machines, and pipe welding machines. We also provide customized solutions to the engineering department. We are the global leader of pipe spool fabrication line and the leading provider of pipe spool fabrication line. We develop and use proprietary welding technology for computer applications for material control, production planning and pipe spool fabrication line.
Formulate industry standards for pipe spool fabrication line:
l Able to supply multiple large projects
l Can choose to use multiple facilities while maintaining a point of contact
l Fully integrated to meet customer material requirements, pipe manufacturing and module assembly
l Online access to the "real-time" status of manufacturing
l Standardized quality plan for all McDermott factories
l Energetic workforce, with unions and open shops
Pipe spool fabrication line is a process of welding pipe components (such as pipes, elbows, tees, flanges, etc.) into the engineering piping system in strict accordance with the design requirements of customers. We strategically have facilities using the most advanced technologies and processes on a global scale.
① The most advanced 1G TIG, 1G MIG and other automated welding processes
② Induction and cold bending
③ Robot cutting and welding
④ Indoor painting
⑤ Non-destructive inspection and heat treatment
⑥ Real-time online spool tracking
⑦ Color-coded barcode shipping label
Our mission is to establish strong partnerships with customers and provide comprehensive and information-rich services through product knowledge and maximum competitive efforts.
Our commitment to the technology investment of the pipe spool fabrication line ensures that the performance and reliability that meet the project execution requirements are improved. Through our main material distribution department, we can purchase materials globally and directly in the factory, while maintaining a large amount of standard inventory, project pre-purchase and invoicing materials!
What is more? WINCOO also provide customers with vairous pipeline construction solutions!
Pipe spool fabrication line is mainly suitable for industrial pipelines. It is widely used in food pipelines, beverage factories, wineries, natural gas, sewage treatment pipes, petroleum, ventilation pipes, construction, bridges, aviation and many other industries. It can be seen that pipe spool fabrication line has many irreplaceable advantages!
Here is the content list:
l What are the performance characteristics and advantages of pipe spool fabrication line?
l What are the functional advantages of pipe spool fabrication line?
l What are the outstanding advantages of the pipe spool fabrication line provided by WINCOO?
What are the performance characteristics and advantages of pipe spool fabrication line?
There are two methods for manufacturing pipe spool fabrication lines, one is "less welding" and the other is "welding". The raw materials of pipe spool fabrication line are pipes, pipe fittings, flanges and forgings. There are various demands such as carbon steel, stainless steel and alloy steel.
The solution of pipe spool fabrication line requires strict quality parameters, from raw materials to final welding quality and size. Usually the drawings are provided by the customer, which can be used for manufacturing or copied into suitable manufacturing drawings.
l Achieve 80% automated manufacturing rate
l Equipped with a short-tube lean manufacturing software management system to achieve a productivity of 0.25manhour/DI
l Reduce customer's manufacturing costs
l Guarantee customer's processing quality
l Enhance customer competitiveness
What are the functional advantages of pipe spool fabrication line?
Pipe spool fabrication line can save manufacturing, inspection and testing costs. It is widely used in chemical, pharmaceutical, winery, petroleum, food, automobile, paper, air-conditioning and other industries.
① By using prefabricated spools, it is easier to manage quality, accuracy and tolerances compared to on-site.
② The pipe spool fabrication line can minimize production delays.
③ By using the pipe spool fabrication line, the problem of insufficient manpower can be overcome to a certain extent.
④ The pipe spool fabrication line will reduce assembly time, thereby ensuring a reduction in project cost and time.
⑤ Users of pipe spool fabrication line have almost no investment in manufacturing and testing equipment.
⑥ Radiographic testing, PMI, MPI, ultrasonic testing, hydraulic testing, etc.
⑦ Manufacture and processing under the strict supervision of third-party inspectors.
⑧ The pipe spool fabrication line avoids on-site rework, avoids power dependence, time delay and ensures
⑨ Better security.
What are the outstanding advantages of the pipe spool fabrication line provided by WINCOO?
Any pipe spool fabrication line can allocate several efficient and reliable welding processes to ensure welding quality. Generally, WINCOO can provide customers with a variety of welding processes and related automatic and mechanical welding equipment.
l Using CNC equipment parts processing, high product precision
l The machine is sturdy and durable, with low maintenance probability
l Using Siemens motor, Pearl River reducer and other brand accessories, high performance;
l Fully automated, simple operation, continuous production, high efficiency;
l The pipe production speed is 15% faster than the peers, and the output is high;
l The production cost is low, the material waste is less, and the pipe yield rate can reach more than 98%;
l We have professional designers and planners to customize different solutions for each of our customers with different requirements, and help customers make more reasonable suggestions for production line layout and production management.
l Provide technical documents and technical support for mechanical installation, maintenance, operation, etc.
l Provide machinery-related transportation information, be responsible for cargo loading and handling transportation related procedures, and always pay attention to cargo safety and logistics information.
l In terms of after-sales service, we have 5 professional after-sales service teams, all of whom have more than 10 years of manufacturing and adjusting machines. They are responsible for the installation, commissioning and after-sales service of the domestic and foreign machines we sell. They can deal with problems in time and better Guarantee the normal production of customers.
l Provide product warranty for one year (within the scope of equipment warranty, man-made damage is not guaranteed, and vulnerable parts are not guaranteed); provide paid services after the warranty period.
l Provide our limited space for short-term storage of the company’s products ordered by customers, and mail transportation on behalf of them.
l With the aim of serving customers well, we always insist on serving our customers well and helping them achieve profit as soon as possible.
Especially on the basis of the project of "short construction period and heavy workload", WINCOO developed the "container pipe spool fabrication line and workstation".
In this original mode, "Cutting/Chamfering", "Assembling", and "Automatic Welding" are integrated into a separate container for easy transportation. Through the logistics system, each container is connected scientifically to improve efficiency, and can also meet the requirements of pipeline manufacturing and improve comprehensive competitiveness!
In recent years, large-scale pipeline projects have started one after another, and the level of mechanical equipment of pipeline construction solutions has been steadily improved. However, the management of pipeline construction equipment on the construction site has not kept up with the speed of pipeline engineering and mechanical equipment updates, resulting in a high rate of equipment failure and maintenance on the construction site. High cost, low technical performance and low utilization rate. In response to these situations, explore standardized maintenance in the management of pipeline construction equipment.
Here is the content list:
l Regarding the maintenance status of pipeline construction equipment at the construction site.
l What are the specific measures to achieve standardized maintenance of pipeline construction equipment?
l How can companies ensure the effective implementation of pipeline construction equipment maintenance procedures?
l Objective conditions cause pipeline construction equipment maintenance to be unable to be carried out normally. Pipeline construction has a large geographic span, harsh construction environment, and increased equipment component wear, which directly affects the stability and reliability of the equipment, causing the mechanical equipment to lose basic performance and fail to operate normally. In addition, the current project schedule is very tight. In order to catch up with the schedule and grab the schedule, it is difficult to keep up with the daily maintenance of pipeline construction equipment.
l Subjectively neglect.The subjective factor that causes the on-site pipeline construction equipment maintenance to be unable to be carried out normally is that the relevant units and management personnel do not pay attention to the equipment management. In many construction companies, the management of the company, project management, and construction crews do not pay much attention to the management of pipeline construction equipment, believing that the equipment is just a tool for wear and tear during the construction process, which emphasizes use rather than maintenance. Many construction projects and construction units arbitrarily extend the maintenance cycle of pipeline construction equipment, reduce the grade of accessories and lubricants, so that the overhaul cycle of the engine is shortened due to human factors, project maintenance costs increase, and the cycle of equipment failures is prolonged. The technical performance of pipeline construction equipment has severely declined.
l Weak technical management capabilities.The quality of equipment maintenance has declined. First of all, many on-site management personnel's understanding of on-site maintenance of pipeline construction equipment is still at the level of "replacement of the three oil filters", and the maintenance of the engine, chassis and working devices is not included in the pipeline construction equipment. Maintenance plan in progress. Secondly, the equipment operators and maintenance personnel do not have a high level of basic skills and cannot complete the overall overhaul of pipeline construction equipment with high quality.
Repair and maintenance of pipeline construction equipmentt is very important. First of all, we must regularly check, maintain and replace vulnerable parts. WINCOO will provide manuals with the machine, such as high-performance pipeline construction equipment, automatic pipeline construction equipment, small pipeline construction equipment, high-precision pipeline construction equipment, easy-to-maintain pipeline construction equipment, etc. The following are specific measures:
① In view of the low maintenance quality of pipeline construction equipment, by compiling comprehensive, meticulous, and highly operable procedures, not only can we clarify what tasks the pipeline construction equipment operators and maintenance personnel need to do daily maintenance and secondary maintenance, but also tell them How to work.
② While compiling maintenance procedures for pipeline construction equipment, the company also compiled checklists for standardized maintenance and management of various types of pipeline construction equipment, making it the main basis for management departments at all levels to inspect pipeline construction equipment, and unify inspection standards and assessment scores. Standards to facilitate the recording, filing and review of equipment inspections and inspection results.
① Personnel training. Strengthen the learning and training of pipeline construction equipment supervisors,managers, and maintenance personnel to change their concepts, fully understand the importance of maintenance to the use of equipment, and cultivate long-term perspectives and implementation of pipeline construction equipment maintenance, and completely avoid the first phase The situation where the project "eaten" a batch of pipeline construction equipment. Through regular learning and training, the standardized equipment maintenance procedures are deeply rooted in the hearts of the people, and become the working guidelines and working habits of operators and repairers, rather than the work requirements of the superior management department. Through learning and training, to a certain extent, the sense of responsibility and dedication of managers at all levels has also been improved.
② Innovate the system of deciding people and machines. In order to mobilize the enthusiasm of equipment operators to rationally use pipeline construction equipment, earnestly maintain pipeline construction equipment, and sincerely care for pipeline construction equipment, the company strictly implements the system of determining personnel and equipment, and integrates the personnel and equipment management information system to control the attendance and equipment of the operators. The intactness of the pipeline construction equipment is linked together, and the man-hours for equipment maintenance are included in the actual man-hours of the operator.
① Increase the intensity of rewards and punishments for pipeline construction equipment inspection. In order to ensure the implementation of the standardization of pipeline construction equipment on-site maintenance, the company pays special attention to the intensity of inspection rewards and punishments for pipeline construction equipment when revising the management system.
② Link the maintenance of pipeline construction equipment with bonuses. In order to motivate the construction unit to use and maintain the pipeline construction equipment, the project department regards equipment maintenance as an important assessment index when formulating the economic responsibility system assessment, guiding the construction unit to use the maintenance pipeline construction equipment rationally, controlling the construction progress and avoiding the problem to the greatest extent.
In order to ensure that pipeline construction equipment maintenance procedures can be effectively implemented, the company has formulated corresponding management systems and adopted specific measures to supervise the implementation of these systems.
l Divide maintenance responsibilities. In the management system, the corresponding responsibilities of equipment operators, pipeline construction equipment maintenance personnel, unit equipment managers, and project pipeline construction equipment managers are clarified, and these responsibilities are written into the maintenance procedures manual of each type of equipment, so that all levels of pipeline construction equipment Managers can see what they should do every day and how to record their work in the maintenance procedures.
l Promote standardized pipeline construction equipment maintenance procedures. Implement standardized equipment maintenance organization processes in each construction project to ensure smooth equipment maintenance channels and optimize the maintenance force of the entire project.
l Establish a professional maintenance team. The project department mobilizes skilled fitters, electricians, and repairers to form a professional maintenance team, which is conducive to the unified scheduling of maintenance forces for the project, and ensures low failure rate and high utilization of pipeline construction equipment.
What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!
The EGW welding used by the tank welding machine is gas-electric vertical welding, which is a gas-shielded arc welding method developed from ordinary gas-shielded gas welding and electroslag welding. The advantages are high productivity and low cost. The main difference with narrow gap welding is that the weld is formed in one pass, rather than multi-pass multi-layer welding.
What is the operation method of tank welding machine?
What are the technical features of tank welding machine?
What is the development trend of tank welding machine?
What is the operation method of tank welding machine?
(1) Left welding method (right→left): small residual height, large width and small splash, which is easy to observe the welding seam, the welding process is stable, the gas shielding effect is good, but the depth of dissolution is shallow.
(2) Right welding method (left→right): The remaining height is large, the width is small, and the splash is large, which is convenient for observing the molten pool and the depth of the molten metal.
(3) Gun delivery method: zigzag swing.
(4) Flat fillet welding does not swing or swing slightly.
(5) The vertical angle is welded upward, and the triangular gun is used.
(6) Welding torch transition: stay on both sides of the molten pool and transition at the front 1/3 of the molten pool.
(7) Gun angle: perpendicular to the weld bead, at an angle of 80-90° along the direction of the gun.
(8) Test plate: the gap is 2.0-2.5mm, and the arc starting point is slightly smaller than the arc ending point. No blunt edge, anti-deformation 1°.
(9) To prevent defects: prevent the angle from melting - burn through the angle. No fusion between layers - pay attention to the gun angle.
The direction of the arc axis of the tank welding machine is perpendicular to the direction of the penetration depth of the weld. During welding, a water-cooled copper slider is used on the front of the weld, and a water-cooled gear row (or pad) is used on the back of the weld. The flux-cored wire is fed into the weldment and in the groove formed by the stopper, the four sides of the molten pool are constrained to realize single-sided welding and double-sided forming at one time. Tank welding machine is a high-efficiency welding technology and equipment.
In recent years, the promotion and application of tank welding machine in engineering has achieved good results, and in-depth research on the fusion welding mechanism of gas-electric vertical welding technology. Tank welding machine has good welding quality, high deposition speed and low comprehensive cost, which provides a broad prospect for the popularization and application of this efficient automatic welding technology and equipment.
With a large number of suppliers, we can choose the right suppliers according to customers' requirements and provide the most cost-effective tank welding machines. For more information, please connect WINCOO ENGINEERING CO., LTD.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong