Automatic welding machine refers to the machine equipment that welds the annular gap. For example, the welds between the upper and lower covers of a household air-conditioning compressor and the housing are welded by a ring welder. Automatic welding machines are divided into vertical girth welding machines and horizontal welding machines. Generally, the welding machine used for the ring welding machine is gas shielded welding with automatic wire feeding. Next, by introducing the automatic welding machine provided by WINCOO, the application environment of the tank welding machine will be described in detail.
Here is the content list:
l Research background of tank welding machine.
l The application prospect of tank welding machine in the future.
l What are the application environments of tank welding machine?
Research background of tank welding machine.
Metal pipe welding is an important part of aeroengine. Fuel, lubricating oil, air, oxygen and other working media in each system rely on metal pipes for transmission. Aviation engine pipeline parts have many types, large quantity, and high accuracy grade. Therefore, the requirements for manufacturing precision and quality are very high, and the requirements for manufacturing methods are getting higher and higher.
The main manufacturing method of metal conduit is tank welding machine welding. The welding of metal conduits of aero-engines mostly adopts manual argon arc welding, flame brazing, induction brazing, etc. The above-mentioned welding method is easy to operate, simple in equipment, low in cost, and low in requirement for a single welded pipe. Pipes, so it is widely used for pipe welding.
However, these welding methods are manual operations, which require very high skills for tank welders. Usually the weld formation is not ideal, and defects such as weld deviation, dents, weld leakage and incomplete welding will occur.
The application prospect of tank welding machine in the future.
In recent years, with the large-scale application of metal conduits, the welding quality requirements of metal conduits have become higher and higher, and the welding of automatic welding machines has become an ideal conduit welding method.
In the 1990s, there was an automatic girth welder for welding metal pipes. The diameter of the welded pipe could cover all the metal pipes on aero engines.Therefore, in recent years, automatic welding machines have been applied to the welding of metal conduits of aero-engines and have achieved success.
What are the application environments of tank welding machine?
In the operation of picking and exchanging electronic components, a tank welding machine welding process is required. Often in order to locate the problem of the circuit function, it is necessary to remove the components from the printed circuit board and perform the necessary measurements.
Generally, the reliable and successful operation of equipment related to space, defense, medical electronics, traffic control systems, communication systems, and supervision and control systems all rely on excellent tank welding machine welding.
1) Disassembly of extra components;
2) Inspection of components;
3) Exchange of defective components;
4) Check the circuit function.
The welding technology of the tank welding machine is an accompanying technology. With the development of the electronics industry, more useful packaging technologies and smaller components will certainly continue to appear, and tank welding machines will continue to be developed to meet the needs of the electronics industry and environmental issues. This is why for technology professors working in the electronics industry today, welding has become more and more professional!
Pipe Spool Fabrication Line have seven steps:blasting→cutting→beveling→fitting-up→welding→non destructive testing→paint spraying.
1.Blasting machine
We need know the size,the weight,the material and clean level of the workpiece.Then we can offer suitable machine to you.
2. Cutting machine
There are three types of cutting machine,are Band saw cutting machine,5Axis CNC flame and plasma cutting and profiling machine and Cutting and beveling all in one.
We need know the size,the weight,the material of the workpiece.Then we can offer suitable machine to you.
①Band saw machine is cold cutting, suitable for carbon steel, stainless steel,there are four lines are 2-24'',8-32'',12-48'' and 24-60''.It’s PLC control,with fixed length function.
②5Axis CNC flame and plasma cutting and profiling machine is hot cutting,suitable for carbon steel.It’s also PLC control.
③Cutting and beveling all in one is cold cutting,and there are three lines are 2-16'',2-12'' and 2-8''.
3.Beveling/Facing machine groove shape are J,U,V,X and so on.It’s PLC or CNC control.Suitable workpiece dimensions are 2-16'',4-24'',8-32'',12-48'',24-48'' and 24-60''.
We need know the size,the weight,the material of the workpiece.Then we can offer suitable machine to you.
4.Fitting-up machine
5.Welding machine,the welding procedure is Root pass→Filling→Capping,there are two types of welding machine: split type and cantilever type.
6.Non destructive testing is NDT,it has three methods of testing:RT,UT and X Ray.
7.Paint spraying is through the Spray booth to achieve.
We need know the size and shape of the workpiece,then we can offer suitable machine for you.
In order to ensure the safe daily operation of equipment, the welding construction of pipeline construction equipment must be strictly controlled to reduce the probability of problems. However, the power plant will inevitably encounter some problems during operation, and these problems are often caused by operational defects in the welding construction during the installation of pipeline construction equipment. There are also many factors that lead to operational defects in welding construction, such as inadequate installation technology, overtime or insufficient supervision.
Here is the content list:
l Attention and prevention points in welding construction of pipeline construction equipment.
l Factors that cause problems during pipeline construction equipment construction.
l Dealing with welding quality problems of pipeline construction equipment.
Attention and prevention points in welding construction of pipeline construction equipment.
Inadequate operation during welding of pipeline construction equipment will leave hidden dangers to engineering safety. When conducting inspection and acceptance of metal welds, relevant technicians need to be careful, careful, and concentrate on studying and judging, and feedback and solve problems as soon as possible . The existing places where the safety quality does not meet the standards should be immediately compensated to ensure that the unit can continue to operate safely and maintain the original economic costs.
When performing welding operations on pipeline construction equipment, technicians must take professional welding measures. In addition, they must also control the quality of plumbing counterparts. In particular, the quality of joints and arc closing must be strictly controlled by technicians.
Therefore, the weld must not be welded in one layer, but two or more layers must be welded, and the inter-level joints must be staggered by more than 10 mm. In order to be able to deal with the weld bead oxidation site, the internal argon must be in place when the stainless steel pipe is welded. At the same time, technicians must strictly control the temperature between layers, and use water cooling for welding if necessary.
Factors that cause problems during pipeline construction equipment construction.
At the same time, it is necessary to find out which environmental factors will affect the welding work of pipeline construction equipment, especially some special welding methods and welding materials have certain requirements on the environment. For example, alkaline electrodes should be in an environment without water, rust and oil, while argon arc welding should be in an environment without wind, water, rust and oil.
According to the welding conditions of different pipeline construction equipment, corresponding protective measures should be taken to ensure welding. stable quality. The welding of pipeline construction equipment usually involves the connection between the weldment and the counterpart, and the quality of the connection will directly affect the quality of the welding.
In order to clarify their responsibilities, the technicians of pipeline construction equipment must inspect and accept the corresponding weldments before starting welding. For peers with unqualified quality, welding technicians can choose to refuse welding.
Violations of regulations must be dealt with seriously. In addition, during spot welding, due to the unstable welding equipment, corresponding stresses will be generated under normal conditions and defects are likely to occur. It is the weakest place in the entire welded joint. We must let welders with relevant qualifications perform spot welding operations.
Dealing with welding quality problems of pipeline construction equipment.
There are always problems of this kind during pipeline construction equipment construction, leading to continuous occurrence of welding quality problems. Once there is a quality problem, we can start from these aspects: First, we must investigate and analyze the cause of the problem. In addition to investigating the person directly responsible for the problem, we must also find out the related reasons.
For example, the management of the construction site is not in place or scientific, and the management personnel are negligent. They should not be deceived by the surface phenomenon of the problem, but should be investigated in depth. When penalties are carried out after the investigation, in addition to punishing the relevant responsible persons, it is also necessary to formulate rewards for those who find problems in advance.
The welding acceptance of pipeline construction equipment is the main link in the welding construction process to control the quality. During the inspection, different inspection methods and inspection ratios need to be adopted for different types of welds to meet the welding quality control requirements.
After the inspection, it is necessary to accurately feedback the specific situation with the relevant process at the first time, and find the cause of the welding quality problem in time, and give improvement measures and suggestions to ensure that the welding quality reaches the standard. The inspection work is usually easily restricted by the inspection environment and conditions.
Therefore, testing can only be carried out on finished products. Generally, there are two popular testing methods: destructive testing and non-destructive testing. In actual work, non-destructive testing is usually adopted, which is also the most common one. In non-destructive testing, air tightness testing and non-destructive testing are often used.
Finally, make a summary of the problem and propose rectification measures. The content of the measures must be implemented, and the time, progress, and person responsible for the rectification shall be clarified. Otherwise, the effect of the rectification will be poor. In short, in the pipeline construction equipment construction process, strictly implementing the welding process, controlling the quality of the counterpart, and reasonably requiring the construction period should be the main points of pipeline construction equipment control. At the same time, in the pipeline construction equipment process, set up the welding process witness point and do a good job in process monitoring.
What is more? WINCOO provide customers with not only various pipeline construction solutions, but also a full range of pipe spool fabrication solutions.
Since entering Chinese market for more than 10 years, products of Wincoo Engineering Co.,ltd has been sold in nearly thirty provinces, cities and autonomous regions in China, and some overseas markets. The company has production line of advanced technology; meanwhile, Wincoo Engineering Co.,ltd designs, develops and processes products for famous domestic installation companies. With professional team, strict management and excellent equipment, the company strives to create the brand of "WINCOO", hydraulic hoist and series supporting products. As an expert of hydraulic hoist, WINCOO with charm of high technology is keen, innovative and forging ahead to establish design language of the company. In an all-inclusive and absorbing and open-minded manner, the hydraulic hoist and hydraulic pump station are perfectly combined to form hydraulic lifting equipment (hydraulic jack). As the founder and disseminator of hydraulic hoist, WINCOO has been building the inverted hydraulic jack and production technology of installation engineering for a long time.We are going to explain how to use the hydraulic jack safely.
●Safe operation code of hydraulic jack
●Precautions for the use of hydraulic jack
●How to repair and maintain hydraulic roof in daily use
1. Hydraulic lifting equipment must be operated by specialized operators;
2. Ground wire must be installed for hydraulic pump station;
3. Check whether motor is rotating in pump indicated direction after startup; motor for this equipment is step-down startup with six second interval. Supply oil for jack after full start of the motor; exhaust air in system via exhaust valve before lifting;
4. Rated pressure for hydraulic system is 25Mpa and pressure indication of pump station pressure gauge cannot exceed 26Mpa;
5. Check clamp block of upper and lower clamps for slip during jack lifting. If block teeth are filled with foreign matters, clean on time and clean the taper sleeve outside block. Grease the taper surface to reduce sliding friction between taper surface and block arc; if teeth shaped surface is severely worn more than 0.4mm, replace block on time. Remove upper and lower clamps and clean after each project. Check wear condition and replace when necessary;
6. Check whether exhaust valve is closed before lifting;
7. Increase pressure slowly during adjustment;
8. System pressure can be at 28Mpa for a short time. Avoid long-term operation for damaging the system;
9. Do not crash high pressure oil pipe with hard objects. Avoid welding slag scorching. Replace high pressure rubber pipe for loss on time;
10. Release the pressure in system via exhaust valve when replacing hydraulic components;
11. Lift jack for a few millimeters when loosening clamp. Unload lower clamp and loosen it;
12. Loosen all lower clamps for butt joint and check; if looseness is inadequate, do not descend jack for opposite joint to avoid lower clamp damage;
13. Adjust pressure precisely when jack is ascending or descending in place. Do not put solenoid valve at neutral position to avoid instantaneous overvoltage;
14. Long-term overload operation is prohibited;
Hydraulic oil level in oil tank should be regularly maintained to normal level. Due to large capacity chamber of piping and hydraulic cylinder, it is mostly required to fill adequate hydraulic oil. After startup, hydraulic oil enters pipeline and cylinder, oil level decreases and filter even shows above oil level. Replenish hydraulic oil once again. It’s inevitable that hydraulic oil has loss during use, therefore, observe oil level regularly and replenish on time to maintain it at the middle position of level meter;
Hydraulic oil shall be kept clean always. Use oil filter vehicle when filling hydraulic oil with filtration precision below 30υm;
Replacing cycle for hydraulic coil is one year for normal operation;
Discharge all residual oil in tank when replacing hydraulic oil and refill after cleaning the tank. Filtration precision of new oil shall not be lower than precision of the system. Oil amount in tank shall be maintained within fixed level range;
Oil temperature shall be appropriate, not more than 60℃. Check for abnormal oil temperature rise. Start hydraulic pump and operate as required after oil temperature reaches 15 ℃ during winter;
Pay attention to the following for initial startup of hydraulic pump:
1) Hydraulic oil level in the tank shall be at the full position of vernier;
2) Check rotation direction of motor and it shall be clockwise seen from motor tail (arrow direction). If the direction id reversed, stop immediately and regain operation after handling;
3) Step up after 10 minutes’ idle operation of pump station;
Pay attention to check return oil filter. Replace cartridge for damage on time;
Before starting and stopping hydraulic pump, unload the overflow valve;
Spares for wear parts (seal ring, clamp block, etc.) shall be available at all times for timely replacement;
Set pressure of overflow valve cannot exceed maximum pressure of hydraulic system;
Check and maintain the jack before operation to ensure there is no oil leakage, clamp and the whole machine is in good condition;
When inserting lifting rod, the jack shall be loosened (loosening nuts at upper and lower clamps are screwed upward in place). Note that lifting rod and jack shall be almost concentric. Reset upper and lower clamps for normal operation and make the jack in operating state;
Prevent mud and sand from entering hydraulic rubber pipes during connection to avoid damaging hydraulic system and the jack;
Overpressure (overload) is prohibited during operation;
Lifting height shall exceed 20-30mm of coaming height and make jack piston at middle position for butt weld;
Make the jack at lifting state when descending the rod and oil pressure cannot be higher than that during lifting, that is to adjust oil pressure below that during normal lifting and then loosen lower clamp. After the jack is back stroke and lifted steel plate falls on newly surrounded plates, the jack bears no load. Loosen upper clamp and lifting rod descends;
According to actual ambient temperature, it is decided to use N46 anti-wear hydraulic oil for the system and mix of other grades is prohibited;
Clean and maintain the jack on time after one project, especially attachment at clamp block teeth. Replace for severe teeth wear and repair the replaced jack.
Time for inspection | Items | Contents |
Monitor operating status during equipment operation | Pressure | System pressure is stable and within specified scope. |
Noise and vibration | Normal | |
Oil temperature | Within 15-60℃, not more than 60℃ | |
Voltage | Within 105%-85% of rated voltage | |
Oil leakage | For oil leakage of the system | |
Inspect before startup | Oil level | Whether at red scale of level meter |
Overflow valve | Whether overflow valve is loosened | |
Ground wire | Whether ground wire is installed for pump station |
Items | Contents |
Screw and pipe joints | Regular fastening: once a month |
Oil filter and air filter | Regular inspection: once a month |
Valve plate of oil tank pipeline | Regular inspection: dismantle, clean and replace sealing during overhaul |
Sealing element | Specify as per working conditions and temperature, replace once every 3-4 years generally. |
Spring | Specify as per working conditions and element quality. Replace for damage on time. |
Hydraulic oil pollution test | Test after 1000 hours’ operation of the newly replaced hydraulic oil. |
Sample with dedicated container to avoid pollution. | |
Sample the operating heated oil instead of static oil. | |
Sample 300-500ml each time. | |
Test oil plants test report and incorporate the result into equipment record. | |
Pressure gauge | Specify inspection cycle as per equipment usage. |
High pressure rubber pipe | Specify replacement cycle as per working conditions. |
Hydraulic components | Specify performance inspection of pump, valve, etc. as per working condition. |
Hydraulic jacking system as a widely used tank lifting machine, its safety is widely supported and proven.What we said above is more to help you know how to use the hydraulic jack safely and correctly. I hope you found this helpful.