In order to ensure the safe daily operation of equipment, the welding construction of pipeline construction equipment must be strictly controlled to reduce the probability of problems. However, the power plant will inevitably encounter some problems during operation, and these problems are often caused by operational defects in the welding construction during the installation of pipeline construction equipment. There are also many factors that lead to operational defects in welding construction, such as inadequate installation technology, overtime or insufficient supervision.
Here is the content list:
l Attention and prevention points in welding construction of pipeline construction equipment.
l Factors that cause problems during pipeline construction equipment construction.
l Dealing with welding quality problems of pipeline construction equipment.
Attention and prevention points in welding construction of pipeline construction equipment.
Inadequate operation during welding of pipeline construction equipment will leave hidden dangers to engineering safety. When conducting inspection and acceptance of metal welds, relevant technicians need to be careful, careful, and concentrate on studying and judging, and feedback and solve problems as soon as possible . The existing places where the safety quality does not meet the standards should be immediately compensated to ensure that the unit can continue to operate safely and maintain the original economic costs.
When performing welding operations on pipeline construction equipment, technicians must take professional welding measures. In addition, they must also control the quality of plumbing counterparts. In particular, the quality of joints and arc closing must be strictly controlled by technicians.
Therefore, the weld must not be welded in one layer, but two or more layers must be welded, and the inter-level joints must be staggered by more than 10 mm. In order to be able to deal with the weld bead oxidation site, the internal argon must be in place when the stainless steel pipe is welded. At the same time, technicians must strictly control the temperature between layers, and use water cooling for welding if necessary.
Factors that cause problems during pipeline construction equipment construction.
At the same time, it is necessary to find out which environmental factors will affect the welding work of pipeline construction equipment, especially some special welding methods and welding materials have certain requirements on the environment. For example, alkaline electrodes should be in an environment without water, rust and oil, while argon arc welding should be in an environment without wind, water, rust and oil.
According to the welding conditions of different pipeline construction equipment, corresponding protective measures should be taken to ensure welding. stable quality. The welding of pipeline construction equipment usually involves the connection between the weldment and the counterpart, and the quality of the connection will directly affect the quality of the welding.
In order to clarify their responsibilities, the technicians of pipeline construction equipment must inspect and accept the corresponding weldments before starting welding. For peers with unqualified quality, welding technicians can choose to refuse welding.
Violations of regulations must be dealt with seriously. In addition, during spot welding, due to the unstable welding equipment, corresponding stresses will be generated under normal conditions and defects are likely to occur. It is the weakest place in the entire welded joint. We must let welders with relevant qualifications perform spot welding operations.
Dealing with welding quality problems of pipeline construction equipment.
There are always problems of this kind during pipeline construction equipment construction, leading to continuous occurrence of welding quality problems. Once there is a quality problem, we can start from these aspects: First, we must investigate and analyze the cause of the problem. In addition to investigating the person directly responsible for the problem, we must also find out the related reasons.
For example, the management of the construction site is not in place or scientific, and the management personnel are negligent. They should not be deceived by the surface phenomenon of the problem, but should be investigated in depth. When penalties are carried out after the investigation, in addition to punishing the relevant responsible persons, it is also necessary to formulate rewards for those who find problems in advance.
The welding acceptance of pipeline construction equipment is the main link in the welding construction process to control the quality. During the inspection, different inspection methods and inspection ratios need to be adopted for different types of welds to meet the welding quality control requirements.
After the inspection, it is necessary to accurately feedback the specific situation with the relevant process at the first time, and find the cause of the welding quality problem in time, and give improvement measures and suggestions to ensure that the welding quality reaches the standard. The inspection work is usually easily restricted by the inspection environment and conditions.
Therefore, testing can only be carried out on finished products. Generally, there are two popular testing methods: destructive testing and non-destructive testing. In actual work, non-destructive testing is usually adopted, which is also the most common one. In non-destructive testing, air tightness testing and non-destructive testing are often used.
Finally, make a summary of the problem and propose rectification measures. The content of the measures must be implemented, and the time, progress, and person responsible for the rectification shall be clarified. Otherwise, the effect of the rectification will be poor. In short, in the pipeline construction equipment construction process, strictly implementing the welding process, controlling the quality of the counterpart, and reasonably requiring the construction period should be the main points of pipeline construction equipment control. At the same time, in the pipeline construction equipment process, set up the welding process witness point and do a good job in process monitoring.
What is more? WINCOO provide customers with not only various pipeline construction solutions, but also a full range of pipe spool fabrication solutions.
Storage tank jacking system is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank. I will give you a detailed introduction of the storage tank jacking system.
What are the applications of storage tank jacking system?
What are the features of storage tank jacking system?
What are the types of storage tank jacking system?
1.The hydraulic jacking system are mainly used for vertical tank top to bottom construction.
2.Also it can be used for mega work piece jacking or lifting.
1.The system consists of hydraulic pump station, cylinders, steel wire, and strokes. Easy to installation and operation;
2.The system utilizes PLC central control to handle lift. Each power pack is equipped with auxiliary balance device to guarantee the precision of simultaneously lifting.
3.Hydraulic jacking system pump station has subsidiary manual control and central control two operation models. The cylinder can be adjusted to lift separately or to lift with several others as one group, and multi groups can also be integrated to lift reach better precision and better welding effect.
4.All the cylinders are with safety valve. It can be automatically locked to avoid cylinder/ tank dropping even under situation of power off, high-pressure hose broken, burst.
5.The cylinder is with one high pressure hose to avoid oil leaking that usually happen by the traditional multiple hoses. Cylinder will return to initial condition by itself weight.
6.Stroke of Hydraulic cylinder is 1475mm, which can satisfy each annular shell with 2500 plate one-step lift. Greatly reduce the time waste.
7.Hydraulic cylinder basic height is 2050mm, which can match automatic girth welding machine to proceed internal girth seam welding.
8.Module configuration, the hydraulic jack quantity can be adjusted as per different size of tank and weight
9.High efficiency, each time lifting or falling down only needs around 15 minutes.
10.Can well cooperate with our tank welding machines, which can greatly reduce the manpower cost and reduce the construction time; Usually one Horizontal seam welding machine can match 6-10 skilled welder. Vertical seam welding machine can match around 20-30 people skilled welder and butt/fillet welding tractor can match 6-15 skilled welder.
At present, we have three types of hydraulic jacking system in WINCOO Engineering Co., LTD. They are the following three: Advanced hydraulic jacking system, Simple unfixing Holding -latch hydraulic Jacking system and Simple chain type hydraulic jacking system.
Storage tank jacking system is mainly used in large tank construction. WINCOO ENGINEERING CO.,LTD is supplying storage tank jacking system to tank contractors worldwide.
Tank welding machine automatically rotates after the steel pipe is connected, and aligns with the welding port for welding. The rotation of the steel pipe is equal to the movement during manual welding. The welding gun can swing, and the speed of the steel pipe can be adjusted. It is used by various construction sites.
What are the production requirements for using tank welding machine?
What is tank welding machine based on?
What service can tank welding machine produced by WINCOO ENGINEERING CO., LTD provide?
1. Under the condition of ensuring the current relevant regulations, safe production and industrial hygiene, the area of all tank welding machines and other facilities should be the smallest;
2. On the premise of completing the production process, the number of process equipment should be the least. Therefore, it is necessary to choose the best tank welding machine production process, and correctly arrange the processing procedures inside and outside the production line;
3. The metal cargo flow inside the workshop is reasonable, avoiding back-transportation and cross-transportation, or reducing it to a minimum;
4. It has the necessary conditions for ventilation and supplying energy to the tank welding machine;
5. The maintenance of process equipment, other facilities and their pipeline systems is convenient and safe;
6. The surrounding environment has the possibility to expand and innovate production;
7. The factory building should maintain the current building standards and use unified components to ensure industrialized construction. Plant planning and design, water consumption, electricity consumption planning, and send professionals to install tank welding machine.
The welding quality of the tank welding machine is greatly affected by the length of the welding arc, and the arc length must be controlled. Based on the crawling gas-electric vertical welding robot, the arc length change during the welding process was studied, and a two-level linkage arc length control system based on the welding trolley and the slider was established.
Tank welding machine utilizes the characteristics of strong dynamic response and high precision of the slider to realize fast and high-precision control of arc length, and uses the control of the trolley to realize the automatic centering of the slider to increase the adjustment ability of the system. The results show that the tank welding machine system has strong anti-interference ability, dynamic response ability and self-adjustment ability.
The tank welding machine produced by WINCOO ENGINEERING CO., LTD can provide automatic complete sets of equipment including CNC hydraulic jacking equipment for large tank flip-chip construction, automatic welding equipment for storage tanks, and welding seam grinding equipment. A series of lean overall solutions for storage tank construction, such as on-site construction tooling suggestions.
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipment for clients, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction, industrial production lines, clean energy project and other industrial fields.
Solution of container pipe spool fabrication line refers to a construction process in which some pipe sections with a determinable or adjustable size in the single-line diagram are concentrated in the specified area in the early stage, and they are assembled, welded, and tested. Because of its good site, it can be divided into processes: blanking section, grouping section, welding section, large-scale prefabrication yard can also be divided into manual bottoming section, automatic welding cover section, and finished product section, which can greatly improve construction efficiency and qualification.
What are the application areas of the solution of container pipe spool fabrication line?
What is the solution of container pipe spool fabrication line?
What information is there about solution of container pipe spool fabrication line?
Through the solution of container pipe spool fabrication line and on-site installation and commissioning, we also provide customers with related accessories for piping systems, including wear-resistant pipes of similar special materials or processed according to drawings, strip tees, mitered elbows, welded transverse three Through, elbow, lined wear-resistant and corrosion-resistant pipe fittings (ceramic, rubber), etc.
Wincoo follows API, ANSI, ASME standards, and can weld and prefabricate high-pressure pipelines and manifolds, mainly used in high-pressure rigid pipeline environments such as onshore and offshore oil drilling, fracturing, mud circulation, production lines, and test tubes. Wincoo is an excellent long-term supplier of high-pressure pipeline products for companies such as PetroChina, Sinopec, etc.
The solution of container pipe spool fabrication line in engineering is simply to make a plan in advance according to the material, shape, length, quantity and some planning instructions of the project that need to be used in each project. report. That is to say, if the project needs to be redone in the future, it can be based on the model used in this project.
Or a plan based on how much material costs and how much money is spent when the project is finally completed, which can save unnecessary costs in subsequent projects.
Solution of container pipe spool fabrication line: Pipe design, prefabrication management, pipe cutting, pipe groove processing, welding, logistics and anti-corrosion paint, pipe flaw detection and other work in a fixed area.
Advantages of solution of container pipe spool fabrication line: It is convenient to coordinate and control quality, progress and management in a fixed area, reduce the workload of on-site prefabrication and on-site installation, and greatly improve the installation, quality and progress of the entire project.
Modern solution of container pipe spool fabrication line: Using QSPT pipe prefabrication production line or QSPT software and equipment, advanced pipe prefabrication automation equipment can be used to improve the efficiency and quality of pipe prefabrication, and maximize the advantages of pipe prefabrication.
Wincoo Engineering Co., Ltd has been developing solution of container pipe spool fabrication line for many years, and is known as "the national brand leader in China". Therefore, customers can choose their products with confidence.
The hydraulic storage tank lifting equipment has a slow lifting speed but is safe and durable, and its carrying capacity is also very amazing. It is the choice of many businesses.
What is the function of hydraulic storage tank lifting equipment?
Why can't the hydraulic storage tank lifting equipment lift?
What are the contraindications to the use of hydraulic storage tank lifting equipment?
T series hydraulic storage tank lifting equipment is large-scale equipment specially developed for the national petroleum reserve project, which is suitable for the inverted welding process engineering of steel giant silos. This type of device is a two-stage single-acting hydraulic cylinder (hydraulic jack) for VTOL workforce or needs to be returned from the back position, it cannot be used for horizontal work. The device is compact in structure, safe and stable, easy to operate, adjustable in load, quick in installation and high in synchronization accuracy. YT series hydraulic storage tank lifting equipment is a "drag five" oil supply method: each pump station is connected to 5 hydraulic cylinders; thus, avoiding the disadvantages of excessive oil pipes and many leakage points caused by traditional centralized oil pipes, and ensuring that environmental pollution is minimized.
There is no oil inside, the small pump gasket cannot move against the steel ball or there are impurities or damage in the recess of the steel ball.
1. Observe whether there is oil in the hydraulic storage tank lifting equipment, and refuel without oil.
2. Clamp the hydraulic storage tank lifting equipment on the vise, remove the handle connecting rod on the small pump, tighten the oil drain valve, and release the air from the oil filling port, loosen the small pump counterclockwise with the afterburner lever of the plum wrench. Use needle nose pliers to pry out the gasket, take out the steel ball, clean the recess, put in the gasket, observe whether there is room for the steel ball to move, and then install it back into the small pump and tighten it.
(1) No overload, super high. When a red line appears on the sleeve, it indicates that the hydraulic storage tank lifting equipment has reached the rated height and should stop lifting.
(2) When several hydraulic storage tank lifting equipment are working at the same time, there must be a special person instructing them to make the lifting or lowering synchronously. Wooden blocks should be supported between two adjacent hydraulic jacks to ensure the interval and prevent sliding.
(3) When using the hydraulic storage tank lifting equipment, always pay attention to the sealing part and the pipe joint part, and it must be safe and reliable.
(4) hydraulic storage tank lifting equipment is not suitable for places with acid, alkali or corrosive gas.
Our company has a skilled team that can customize exclusive products for you according to the different needs of customers. If you are interested in this product and want to know more about it, please contact WINCOO ENGINEERING CO., LTD.