Hydraulic jacking equipment is a new and special lifting equipment powered by hydraulic oil. By pushing the reciprocating movement of the hydraulic cylinder piston, load conversion is carried out between the upper clamping mechanism connected with the upper end of the piston and the lower clamping mechanism connected with the lower part of the cylinder, so as to realize lifting.The hydraulic jacking equipment is a single-acting two-stage hydraulic cylinder, used for vertical take-off and landing work, return need external force or self-weight back.The equipment is compact, stable, easy to operate, adjustable load, fast installation, high synchronization accuracy.Today we are going to focus on the simple hydraulic jacking system.
1, simple operation, adjustable load, stable equipment lifting, good synchronization effect.
2, good compatibility, greatly saving customers' tooling costs.
3, can cross work with the inner ring automatic welding machine.
1,Pump station (YB-40)
Maximum pressure | 25MPa |
Power | 11KW |
Rated oil flow | 40L/min |
Motor rotate speed | 1470r/min |
Oil tank capacity | 240L |
System temperature | 20-60ºC |
Oil filter precision | 20υm |
Voltage | Main power supply 220V, 3 phase) |
System oil type | L-HM46# antiwear hydraulic oil |
Total weight | 370Kg |
Outsize(mm) | 950*850*820 |
Theory lifting capacity | 123KN |
Rated lift capacity | 120KN |
Rated oil pressure | 18MPa |
Hydraulic stroke | 100±0.5mm |
Glissade capacity | ≤5mm |
Weight | ≤30Kg |
Oil outlet | M16*1.5 |
Installation size for jack base | Settle 4-M16 on the circumference of a φ120 circle |
Installation size for up and down chuck | Settle 3 *16U hole on the circumference of a φ110 circle |
Size(mm) | 138*138*500 |
Suitable lifting rod | φ32round steel(45#) |
Chuck device | Screw mechanism |
3,Jack support (TSJ-120-2600L)
Total height | 3460mm |
Lifting rod height: | 3900mm |
Slider stroke | 2630mm |
Sliding block guide wheel quantity | 4 pcs |
Lifting rod diameter | φ32mm |
distance between expansion loop support to ground | 310mm |
Size(mm) | 3900*300*300 |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
1. Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time.
2. We can provide all technical documents and advices to support you for construction procedure clearifications
3. We can calculate the most suitable number of hydraulic jack according to the weight of the tank
4. We can provide your suitable hydraulic jack accessories with much more competetive price from our long time business partner if you need.
5. We can provide site people training service, and operation service or manpower service or as a subcontractor.
Please click on our website for more information.Thank you!
YT-C type hydraulic storage tank lifting equipment is a set of large hydraulic lifting equipment specially developed by our company for national crude oil reserve project in 1994.As long as the number of hydraulic cylinder and pump station system is increased or decreased, this type of equipment can be applied to the inverted construction of large storage tanks with different volumes ranging from thousands of cubic meters to hundreds of thousands of cubic meters.
The control part adopts Siemens PLC modular design concept, simple operation, reliable quality.The hydraulic cylinder can be used for single or multiple lifting height adjustment, and can also be used for centralized control of multiple groups.Through more than ten years of practice summary, we continue to optimize the equipment, improve the production process, so that the product quality and performance greatly improved, the majority of users praise.
1, The hydraulic lifting equipment is evenly placed inside the jacked tank. The overall force and lateral force of the equipment are calculated strictly and successfully applied.
2, The structure is rigorous and compact, the output force is adjustable, the jacking speed meets the jacking requirements, and the synchronization accuracy is high.
The transfer of force: output force of hydraulic cylinder → steel wire rope → rising ring (welded with lifting lug) → rib plate for transferring force → tank wall jacking
Jacking control process:
1, Pump station control box (rotating selection button) → Centralized control operation box (Figure 1-3) → hydraulic jacking pump station (solenoid of valve group) →PLC devices → centralized control operation box → hydraulic jacking pump station → integral or partial lifting or lowering of hydraulic cylinder.
2, Pump station control box (rotating selection button) → control handle → hydraulic cylinder (single or multiple) fine adjustment up and down.
1, The system consists of hydraulic pump station, cylinders, steel wire, and strokes. Easy to installation and operation;
2, The system utilizes PLC central control to handle lift. Each power pack is equipped with auxiliary balance device to guarantee the precision of simultaneously lifting;
3, Hydraulic lift pump station has subsidiary manual control and central control two operation models. The cylinder can be adjusted to lift separately or to lift with several others as one group, and multi groups can also be integrated to lift reach better precision and better welding effect;
4, All the cylinders are with safety valve. It can be automatically locked to avoid cylinder/ tank dropping even under situation of power off, high-pressure hose broken, burst;
5, The cylinder is with one high pressure hose to avoid oil leaking that usually happen by the traditional multiple hoses. Cylinder will return to initial condition by itself weight;
6, Stroke of Hydraulic cylinder is various as per tank plate width, which can satisfy each annular shell plate one-step lift. Greatly reduce the time waste;
7, Hydraulic cylinder basic height is based on the tank shell width, which can match automatic girth welding machine to proceed internal girth seam welding;
8, Module configuration, the jacking system quantity can be adjusted as per different size of tank and weight;
9, High efficiency, each time lifting or falling down only needs around 15 minutes;
10, Can well cooperate with our tank welding machines, which can greatly reduce the manpower cost and reduce the construction time.
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.If you want to know more about hydraulic lifting equipment, please visit our website
Hydraulic tank jacks is widely used in China for jacking in various situations.Today we are going to focus on the hydraulic tank jacks for tank jacking.
Hydraulic tank jacks is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank.
At present, we have three types of hydraulic tank jacks in WINCOO Engineering Co., LTD. They are the following three: Advanced hydraulic jacking system, Simple unfixing Holding -latch hydraulic Jacking system and Simple chain type hydraulic jacking system.
At present, there are six construction methods of large storage tank construction: hydraulic jack, central column, floating, forward loading, mechanical jacking. Hydraulic tank jacks is the most widely used one, which is characterized by wide adaptability and can theoretically be applied to any size tank;The operation control is simple, reliable and less threatening.So it is adopted by more and more people.Hydraulic tank jacks is an important part of hydraulic jacking system.
As one of the most comprehensive hydraulic tank jacks production and sales companies in China, we can produce hydraulic tank jacks suitable for you according to the specific needs of customers.Whether it is oil tank, gas tank, sugar tank, granary, etc., we have suitable hydraulic tank jacks.
We currently have three types of tank jacking system, which are advanced tank jacking system, chain tank jacking system and simple tank jacking system.Advanced tank jacking system has the most advanced hydraulic jacking technology available.Today we talk about the advanced tank jacking system.
Here is the content list:
What is the working principle of advanced tank jacking system?
What are the product components of the advanced tank jacking system?
What are the construction steps of advanced tank jacking system?
Advanced tank jacking system (package unit) is evenly distributed around tank inner wall. Tank top and upper (the first layer) wall plates are lifted first and then install and weld wall plates of tank body. Self locking advanced tank jacking system and hydraulic hoist composing of lifting frame and lifting rod are adopted. When oil enters advanced tank jacking system, upper clamp fastens and lifts lifting rod and expansion ring and mobilize tank (including tank top) to ascend upward. When oil returns to jack, upper clamp returns with piston and lower clamp automatically fastens lifting rod without gliding. The jack repeats the movement and make lifting rod ascend with tank to designated height (spare height for next layer of plate). After butt weld of next layer of wall plates, open upper and lower loosening device and loosen upper and lower clamp to make lifting rod and expansion ring descend to lower expanded and welded rib plate of the next layer of wall plates and then lift. Repeat the process and ascend welded tan till the last layer of wall plates are installed and welded. The installation of the whole storage tank is completed.
1.One Module include
2.1 set x Power Pump Station: Hydraulic power supply, motor power 4KW, rated flow is about 15l/min.
3.5 sets x jacking cylinder: 25 tons rated (18 tons, 100%) (Including Hydraulic Jacking Device Components — Steel Cables, Support Device, Pull Rod, etc.)
4.5 sets x oil hoses system:One tank construction needs one jacking control system. Each jacking control system includes:
5.1 set x Electrical Controls and operating panels:
1.1 centralized PLC operation control box,
2.1 power source cabinet
With the concentrated push-button and automatic PLC control system or single-set handle operated control.
Motor and PLC are with brand of SIMENS
Main electric element are Schneider brand
Hose with USA and China JV famous brand
The following short description gives the working procedure in outline. It can in certain details be modified when required.
1.The tank bottom – plates are placed on the prepared foundation and welded together.
2.The beams or lattice work of the roof are assembled and finally joined to the upper rim of the shell ring.
3.The hydraulic jacking system is installed in the tank. The plates of the second shell ring (next to the top ring) are positioned outside the first one.
4.The completed part of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the second ring can be moved into place and the roof sheeting can be completed.
5.The plates of the second shell ring are located exactly and welded together to the lower edge of the first ring.
6.The plates of the third shell ring are placed outside the second shell ring.
7.The completed part of the tank (roof the two uppermost shell rings) is lifted.
8.The above cycle of operations is repeated until the last (bottom) shell ring is finished.
9.The entire tank is lowered down to the bottom plate and welded to this.
10.The lifting equipment is dismantled.
Above we talked about the working principle of advanced tank jacking system,equipment components and installation steps.If you need to know more, please visit our website for more information about advanced tank jacking system.
When using the tank welding machine, the operator puts the lamp tube into the fixture, presses the start button, the two pressing cylinders descend to position the workpiece in the ultrasonic mold cavity, and then the ultrasonic welding head acts to trigger the ultrasonic wave, and the welding head carries out the workpiece. After welding and welding, the cylinder drives the upper die to reset, the pressing cylinder rises, and the operator takes out the workpiece to complete one operation.
What are the characteristics of automatic vertical welder?
What is the working principle of tank welding machine?
What is the working effect of tank welding machine?
Automatic vertical welder is high-efficiency automatic welding equipment that uses current feedback closed-loop control of vehicle lift. The thickness of the welded joint can be up to 50mm at one time. Mainly used for thick plate welding in petroleum, chemical, blast furnace, shipbuilding and other industries. EGW vertical gas electric welding machine is a kind of high-efficiency automatic welding equipment improved according to the current feedback closed-loop control welding trolley. The main feature of automatic vertical welder is that the thickness is from 10mm to 50mm in one pass of forced water cooling. At the same time, the molten pool level is automatically controlled, and the wire extension length is automatically adjusted. Small size and light weight welding trolley, flexible and modular, easy to update and easy to use. Widely used in petroleum, chemical, blast furnace thick plate welding and shipbuilding industries.
In most cases, the EGW used in the tank welding machine uses carbon dioxide gas as a protective gas, but sometimes pure argon, argon carbon dioxide mixed gas, argon oxygen mixed gas, and argon helium mixed gas are used. Welding wire is often made of flux wire that creates slag and provides an aesthetically pleasing weld, but sometimes solid wire is used.
Tank welding machine surrounds the molten pool with the base metal end and copper lining or refractory lining material, and can perform vertical upward welding while preventing dripping of molten metal, so it can be welded in a single pass (single operation) Welding of thick plates. Its applications include welding of vertical butt joints such as ship side outer panels, bridge construction, storage tanks, pressure vessels, etc.
Tank welding machine is usually used for welding thicker materials such as low carbon steel and medium carbon steel, and can also be used for welding austenitic stainless steel and other metal alloys. The thickness of the plate is 12~80mm the most suitable. If it is larger than 80mm, it is difficult to obtain a sufficient and good protective effect, resulting in pores in the weld, uneven penetration and incomplete penetration. The length of the welded joint is generally unlimited. Single-layer welding is the most commonly used welding method, but multi-layer welding can also be used.
Complete after-sales service, WINCOO ENGINEERING CO., LTD can provide online and offline technical support, not only video guidance, but also on-site guidance, want to know more about high efficiency pipeline construction equipment, horizontal pipeline construction equipment, stainless steel pressure vessel, etc.
Hydraulic storage tank lifting equipment plays a very important role in handling heavy objects. The lifting effect is very good. It is more suitable for lifting heavy objects with a low height and can undertake a lot of lifting operations.
What are the precautions for hydraulic storage tank lifting equipment?
What should I do if the platform of the hydraulic storage tank lifting equipment lift cannot be lowered?
What is the working process of hydraulic storage tank lifting equipment?
1) If the emptying phenomenon occurs during use, you can first loosen the oil drain screw on the pump body, hit the vertical head of the pump body down a few times, and then tighten the oil drain screw, you can continue to use the hydraulic storage tank lifting equipment.
2) When using, do not add partial load or overload, so as to avoid the danger of hydraulic storage tank lifting equipment damage. When there is a load, do not remove the quick connector to avoid accidents and damage to the parts.
When using hydraulic storage tank lifting equipment lift, sometimes the lifting platform cannot be lowered. The solution to the hydraulic storage tank lifting equipment lift not being lowered depends on the situation:
1. The drop valve fails,
Troubleshooting method: In the case of pressing the down button, check whether the down valve has electricity. If there is no electricity, try to eliminate it; if there is electricity, then eliminate the failure of the down valve itself and replace the drop valve.
2. The deceleration control valve is out of balance
Remedy: Adjust the descending speed control valve, if the adjustment is invalid, you need to replace the new valve.
When the hydraulic storage tank lifting equipment is stretched, the front and rear oil nozzles are opened, and oil is supplied from the rear oil nozzle to the tensioning working oil chamber, and the cylinder body of the tensioning cylinder moves backward. Since the cylinder cable is anchored on the tool anchor at the top of the jack, the hydraulic storage tank lifting equipment stretches the steel cable through the tool. When the wire rope is stretched to the required length, close the rear oil nipple, and feed oil from the front oil nipple into the top pressure cylinder, so that the top pressure cylinder piston moves forward to support the anchor plug, and the anchor plug is pressed into the anchor ring. Thus, anchoring the cable. Open the rear oil nozzle and continue to feed oil from the front oil nozzle. At this time, the tension cylinder moves forward and the oil in the cylinder returns. Finally, open the front oil nozzle to make the oil in the top pressure cylinder return, and the top pressure piston returns to its original position due to the action of the return spring.
After reading the above information, are you interested in it? If you also want to order a fully hydraulic storage tank lifting equipment, please contact WINCOO ENGINEERING CO., LTD.
The following short description gives the working procedure in outline. It can in certain details be modified when required.
Step 1. The tank bottom – plates are placed on the prepared foundation and welded together.
Step 2. The beams or lattice work of the roof are assembled and finally joined to the upper rim of the shell ring.
Step 3. The jacking equipment is installed in the tank. The plates of the second shell ring (next to the top ring) are positioned outside the first one.
Step 4. The completed part of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the second ring can be moved into place and the roof sheeting can be completed.
Step 5. The plates of the second shell ring are located exactly and welded together to the lower edge of the first ring.
Step 6. The plates of the third shell ring are placed outside the second shell ring.
Step 7. The completed part of the tank (roof the two uppermost shell rings) is lifted.
Step 8. The above cycle of operations is repeated until the last (bottom) shell ring is finished.
Step 9. The entire tank is lowered down to the bottom plate and welded to this.
Step 10. The lifting equipment is dismantled.
The tank construction process needs two kinds of equipment, respectively is the welding machine and the hydraulic jacking system, the welding machine is divided into the horizontal welding machine and the vertical welding machine;the hydraulic jacking system is also divided into senior hydraulic jacking system and simple hydraulic jacking system.(If your tank is bottom to top,you don’t need the hydraulic jacking system.)
The plasma and flame cutting machine is a portable multifunctional plasma welding, cutting, high energy flame heating equipment.
What are the precautions for the use of plasma and flame cutting machine?
Compared with similar products, what are the characteristics of plasma and flame cutting machine?
What are the advantages of plasma and flame cutting machine?
1. Points to be paid attention to in forging cutting
Due to the thicker oxide scale on the surface of the forging and the fact that the ignition point of the oxide scale is higher than the melting point, the plasma and flame cutting machine is prone to cutting interruption during cutting, resulting in reduced cutting quality and reduced work efficiency. For this reason, when the forging is cut, the oxide scale on the upper and lower surfaces of the cutting area should be removed before cutting to improve the cutting speed and cutting quality.
2. The main points of anti-deformation in rolling billet cooling bed tooth plate cutting
How to control the deformation of the workpiece during cutting is very important. For example, arranging the cutting route according to the routine will cause the workpiece to be deformed and out of tolerance. Even if it is reshaped, it is difficult to meet the size requirements, and the product will eventually be scrapped. Therefore, it is very important to arrange the gas cutting route of the plasma and flame cutting machine reasonably.
3. Points to be paid attention to in thick plate cutting
In thick steel plate cutting, the temperature decreases from the top surface down. At the beginning of cutting by plasma and flame cutting machine, the oxygen pressure is gradually increased, and finally reaches a uniformity in the thickness direction of the steel plate. This results in inconsistent combustion in the thickness direction of the steel plate at the starting position of cutting, and defects at the starting end of the workpiece cutting.
Compared with laser cutting: plasma and flame cutting machine is far less than laser cutting machine in terms of cutting speed accuracy and cutting material types, but it is better than laser cutting machine in cutting thickness and cutting cost.
Compared with high-pressure water jet cutting machine: the precision of high-pressure water jet cutting machine and the types of cutting materials are better than plasma and flame cutting machine, but plasma and flame cutting machine are larger than water jet cutting machine in cutting speed and cutting thickness, and the equipment The cost and cutting cost are relatively low.
The plasma and flame cutting machine can be used for drawing, programming, nesting, verification and CNC cutting of any shape parts. Improve the steel nesting rate, effectively save steel; improve the efficiency of programming, nesting and cutting, and effectively improve the cutting production efficiency.
Great products begin with the best engineering staff, and WINCOO ENGINEERING is ready to assist you with your technical requirements for plasma and flame cutting machine.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong