Hydraulic jacking system is mainly used for inverted construction of vertical cylindrical steel storage tank (hydraulic jacking method) and inverted construction of vertical cylindrical low-temperature storage tank in petrochemical industry.It can also be used for vertical lifting and lifting of super large objects.
What are the main features of the hydraulic jacking system?
1, The system consists of hydraulic pump station, cylinders, steel wire, and strokes. Easy to installation and operation;
2, The system utilizes PLC central control to handle lift. Each power pack is equipped with auxiliary balance device to guarantee the precision of simultaneously lifting;
3, Hydraulic lift pump station has subsidiary manual control and central control two operation models. The cylinder can be adjusted to lift separately or to lift with several others as one group, and multi groups can also be integrated to lift reach better precision and better welding effect;
4, All the cylinders are with safety valve. It can be automatically locked to avoid cylinder/ tank dropping even under situation of power off, high-pressure hose broken, burst;
5, The cylinder is with one high pressure hose to avoid oil leaking that usually happen by the traditional multiple hoses.Cylinder will return to initial condition by itself weight;
6, Stroke of Hydraulic cylinder is 1475mm, which can satisfy each annular shell with 2630plate one-step lift. Greatly reduce the time waste;
7, Hydraulic cylinder basic height is 2050mm, which can match automatic girth welding machine to proceed internal girth seam welding;
8, Module configuration, the jacking system quantity can be adjusted as per different size of tank and weight;
9, High efficiency, each time lifting or falling down only needs around 15 minutes;
10, Can well cooperate with our tank welding machines, which can greatly reduce the manpower cost and reduce the construction time.
Why can we specialize in the production of hydraulic jacking system?
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
1, We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
2, Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
3, To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
What do you want to know most about buying hydraulic jacking system from us?
1. Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time;
2. We can provide all technical documents and advices to support you for construction procedure clearifications;
3. We can calculate the most suitable number of hydraulic jack according to the weight of the tank;
4. We can provide your suitable hydraulic jack accessories with much more competetive price from our long time business partner if you need;
5. We can provide site people training service, and operation service or manpower service or as a subcontractor
If you want to know more about hydraulic jakcing system related information, you are welcome to visit our website
The installation of pipeline construction equipment is one of the necessary parts in the pipe construction solution, and the installation and construction of pipeline construction equipment is a very important stage in project construction. Due to various factors in the project construction, there are many problems in the installation of pipeline construction equipment. To promote the improvement of the quality of industrial pipeline installation, certain measures need to be taken to control the installation quality of pipeline construction equipment to ensure the smooth construction of the project.
Here is the content list:
l Regarding the quality inspection of pipeline construction equipment installation.
l What are the quality control measures in the installation of pipeline construction equipment?
l Regarding the quality control of pipeline construction equipment after construction.
The sequence of installation of pipeline construction equipment is:
Measuring arrangement→cleaning the construction work area; construction road→conveying anticorrosion pipe→processing tank→distributing pipe→preparing nozzle; pipeline assembly→pipe assembly and welding→welding joint inspection→heat shrinkable casing (tape) bushing→ trench excavation →Appearance repair .
After the installation of pipeline construction equipment is completed, quality inspection is required. After pipeline construction equipment is installed and put into use, regular monitoring is required. Generally, radiographic inspection is used to inspect the quality of pipeline installation. This monitoring has a very good effect on the internal inspection of welded joints. It is widely used in the field of construction equipment installation. This method can also be used to make the quality of the pipeline meet the assessment standard.
Before installing pipeline construction equipment, clarify the construction plan of the construction technicians, use GB/T as the standard, and carry out construction in accordance with national standards and specifications; during the installation of pipeline construction equipment, strictly review the drawings for defects to ensure the rationality of the drawings, and the construction unit It is also necessary to make preparations for pipeline installation and construction, pipeline lumber, welding inspection, construction site management, etc.
Strictly follow the relevant requirements of pipeline construction equipment and pipeline construction requirements to improve the quality of construction. In order to ensure the quality of pipeline installation, quality control is required for key parts such as welding materials, welding processes, and welding seams to ensure pipeline construction equipment. Welding consumables, brands, specifications, etc. are required by the plan design, which are consistent with the project construction requirements to ensure the quality of installation.
① After the pipes, accessories and raw materials used for pipeline construction equipment enter the construction site, the supervisors shall check and accept them on site, and store the materials after passing the acceptance.
② Pipe joints and semi-finished products of pipeline construction equipment should be guaranteed not to be damaged during transportation and storage. When unloading, handle with care and not collide with each other; choose a flat place for stacking pipe joints.
③ The storage temperature of the rubber ring of pipeline construction equipment is between -5 and 30 degrees Celsius. It should not be exposed to ultraviolet light source and keep away from the heat source; the rubber ring and the items that easily affect the rubber ring should not be put together. If the pipeline construction equipment is being constructed In winter, hard rubber rings are not allowed.
④ For trench excavation in open-cut pipeline engineering, the section should meet the design requirements of construction quality, the original soil at the bottom of the trench should not be damaged, and the mechanical excavation should reserve a 200-300mm soil layer for manual excavation and leveling, and the bottom of the trench can be soaked by water And frost damage, if there is gravel soil, lime soil to backfill, the trench wall should be leveled to meet the requirements of construction design.
⑤ For concrete construction, when the pipe seat and flat foundation are poured in layers, the flat foundation should be shaved and rinsed; the concrete should be prevented from segregation, and the concrete should be cured after pouring.
⑥ When pipeline construction equipment is installed, visual inspection and internal cleanliness of the pipeline must be inspected.
⑦ The flexibility of pipe joints must meet the design requirements, and the rigidity must also meet the requirements.
⑧ In the stage of backfilling, the backfill height between both sides of the pipe and the top of the pipe before the hydraulic test of the pressure pipeline is greater than 0.5M, and the pressure-free pipeline shall be backfilled after the closed water test and the closed gas test have reached the standard.
After the completion of the pipeline construction equipment, the finishing work will begin. The unit needs to organize personnel to review the material documents involved in the pipeline installation, project reports, etc.; after the completion of the project, debugging and quality appraisal are required, and the pipeline professionals are organized to conduct quality appraisal of the installed pipelines. The dynamic control of the links will protect the completed pipelines.
In the later stage of the installation of pipeline construction equipment, in order to ensure the smooth completion of the project, the quality of the pipeline needs to be tested again to ensure that the pipeline installation does not have problems such as tilt and cracks, the welding parts are of good quality, and the pipeline is unobstructed. In the later period after the completion of the project, it is necessary to sort out each project data and work files involved in the pipeline construction, do a good job of archiving and backup to evaluate the quality of the pipeline, do a good job in risk control, and carry out the acceptance of pipeline construction equipment.
There are many influencing factors in the installation of pipeline construction equipmentt, so reasonable measures need to be taken to monitor and control every aspect of pipeline construction equipment. With the continuous expansion of the pipeline construction equipment construction industry, the use area is also expanding. Due to the importance of pipeline use, it is necessary to control the pipeline installation quality to ensure that the installation quality reaches the ideal standard!
What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!
With the continuous improvement of people's living standards, increasingly fast transportation methods have become more and more urgent needs of people. The railway is closely related to people's daily life. It is one of the important parts of the transportation hub and the important infrastructure of the country, which is directly related to people's vital interests. At the same time, the orbital welding machine is also gradually applied in many processing industries.
What is the importance of orbital welding machine?
Why do more and more people choose orbital welding machine?
What is the function of orbital welding machine?
As an important tool for transporting passengers, the manufacturing level of trains directly affects the development scale and speed of rail transit. Various advanced technologies have also been widely used in the manufacture of rail transit vehicles. Among them, the welding technology of orbital welding machine has unique advantages in the manufacturing process of stainless-steel car body, and will definitely become a powerful weapon for welding in the future.
The application of orbital welding machine welding technology in the field of rail vehicle manufacturing is not only used as cutting energy for cutting and welding of key components as welding energy, but also in other fields of application. For example, in orbital welding machine equipment as a key device for positioning and tracking - laser scanning tracking and positioning system. In the quality control system, a micro-mark identification and barcode management system is introduced, and a laser marking machine is used to engrave a part code with a depth of 0.1mm on the plate parts, which is used to realize the original information of the steel plate material and the coding information such as the part name and code number. Identity migration. Through effective management, the whole process quality tracking of products can be achieved and the quality management level can be improved.
Orbital welding machine can realize seamless welding technology so that there is almost no welding point between the two rails, and the transition is natural. On the high-speed rail, the sound of "banging" will become history. After the high-speed rail rails are laid, the technicians will use the welding technology brought by the advanced orbital welding machine to carry out secondary welding and grinding between the rails. The 500-meter-long, 30-ton steel rails are welded into a super-long seamless line, so that a track can be laid to the bottom. There is a soft connection at the expansion joint, and the expansion space after heating is reserved. There is no interface insight, as if two complete rails are connected to the end. Such an orbital welding machine can ensure the stability of the driving.
With a large number of suppliers, we can choose the right suppliers according to customers' requirements and provide the most cost-effective products. Wincoo Engineering Co., Ltd provides big pressure vessel, heavy duty pressure vessel, industrial pressure vessel, automatic pipeline construction equipment, electric vertical tank construction solution, etc.
hydraulic storage tank lifting equipment is suitable for various lifting operations with small lifting height. It consists of oil chamber, oil pump, oil storage chamber, piston, crank handle, oil valve and other main parts.
What should I do when there is a problem with the control system of the hydraulic storage tank lifting equipment?
Before using hydraulic storage tank lifting equipment, what should be paid attention to avoid malfunction?
What is the reason why the temperature of hydraulic storage tank lifting equipment is too high and cannot be lifted?
Countermeasures adopted: the hydraulic control system of hydraulic storage tank lifting equipment should be replaced immediately for maintenance due to common failures; maintain the cleaning of the hydraulic transmission system, and clean the filtration system (including the emulsion tank) on time; the key components of the hydraulic control system of the hydraulic press (such as Hydraulic seals) are very damaged to maintain, spring yellow parts should be sampled and tested on time, valves should be tested for characteristics, welding leaks should be repaired after dismantling the internal hydraulic seals, and pressure tests should be performed as required.
1. The weight of the object must be estimated before lifting, and remember to overload it.
2. When using, the center of gravity of the object must be determined, the focus point of the jack should be selected, and the placement should be stable. At the same time, the degree of softness and hardness of the ground must also be considered. If necessary, a tough wooden board should be padded to prevent skewing or even tipping during lifting.
3. This hydraulic storage tank lifting equipment is only used for jacking up. After the heavy object is jacked up, it should be supported by tough support (vehicle support, tough wood or other materials) to prevent the failure of the jack. Danger.
4. If several thousand hydraulic storage tank lifting equipment are used together, the lifting speed should be kept synchronized, and the load of each hydraulic storage tank lifting equipment should also be balanced, otherwise there will be a danger of tipping.
5. hydraulic storage tank lifting equipment should avoid sudden vibration when using it.
What is the reason why the temperature of hydraulic storage tank lifting equipment is too high and cannot be lifted?
There are several reasons for the high temperature of hydraulic storage tank lifting equipment: 1. Not enough hydraulic oil; 2. Too dirty hydraulic oil; blocked filter element; 3. Low pressure of safety valve; 4. Damaged working pump; In order from easy to difficult to rule out.
With a large number of suppliers, we can choose the right suppliers according to customers' requirements and provide the most cost-effective products. WINCOO ENGINEERING CO., LTD provide big pressure vessel, heavy duty pressure vessel, industrial pressure vessel, automatic pipeline construction equipment, electric vertical tank construction solution, etc.