The use of pipeline construction equipment is inevitable in the chemical industry. Pipeline installation is an inevitable part of project construction. However, the installation of pipeline construction equipment requires a certain degree of professionalism and pertinence. Relevant departments need to strengthen industrial management and do a good job of quality control of pipeline installation , Lay a solid foundation for my country's industrial development.
Here is the content list:
l Introduce the basic information of pipeline construction equipment.
l Introduce the safety and environmental protection measures of pipeline construction equipment.
l Introduce the influencing factors in the installation of pipeline construction equipment.
Introduce the basic information of pipeline construction equipment.
l Main material
Q345 steel plate, submerged arc welding wire, electric welding rod, two protection welding wire, CO2 gas, oxygen, acetylene gas, carbon rod.
l Machines and equipment
Electronic goniometer, steel tape measure, weld ruler, square ruler, non-destructive flaw detector, multi-head automatic cutting.Machine, assembly machine, DC arc welding machine, automatic submerged arc welding machine, CO2 gas shielded welding machine, creasing machine, radial drilling machine, radial drilling machine, planer, medium-sized oven.
l Quality Control
In accordance with the construction quality management system of pipeline construction equipment, establish quality acceptance standards for finished components of processing plants. Prepare the corresponding technical plan before processing, organize the management and operation personnel involved in processing to carry out training, so that the relevant operators can fundamentally solve the problems existing in the process of processing pipeline construction equipment.
Introduce the safety and environmental protection measures of pipeline construction equipment.
The use of pipeline construction equipment can effectively guarantee the processing quality of steel crane beams, reduce the amount of correction work, reduce production costs, speed up the production rate, and reduce the adverse effects on the welds caused by measures such as the fixed and mandatory correction of semi-finished products during the processing , It has a positive effect on the improvement of the processing technology of steel crane beams.
l Safety measures
Before making steel crane beams, a processing plan or processing technology should be prepared, corresponding safety technical guarantee measures should be formulated, and safety technical clarifications should be made.
① Operators must be familiar with the safety operating procedures of machinery and equipment in the production of pipeline construction equipment and the safety technical operating procedures of this type of work, and operate in strict accordance with the procedures for safe operations.
② The electricity consumption of the production workshop or site must be managed by a full-time electrician and hold a certificate.
③ The electric oxygen welder must obtain the corresponding electric welder qualification certificate.
④ Materials, semi-finished products, and finished products should be slowly and steadily lifted during production, turning over, and lifting.
⑤ Place it to prevent bumping or falling over and crushing people. Lifting personnel must have corresponding qualifications.
⑥ All workers wear protective equipment as required.
⑦ All kinds of pipeline construction equipment must have good grounding and zero connection.
⑧ Establish a full-time safety officer to conduct safety inspections and inspections on the work site, and find unsafe factors, promptly propose and implement corrective measures.
l Environmental protection measures
The installation of pipeline construction equipment is one of the necessary steps in the industrial field, and the installation and construction of pipeline construction equipment is a very important stage in project construction.
Due to the influence of various factors during project construction, there are many problems in the installation of pipeline construction equipment. In order to promote the improvement of industrial pipeline installation quality, certain measures need to be taken to control the pipeline installation quality to ensure the smooth completion of project construction.
① The construction site should be kept clean. All items should be arranged in time and placed in an orderly manner.
② Noise should be controlled during operation, and operation time should be arranged reasonably to reduce the impact on the surrounding environment.
③ The working lights at night should be irradiated into the field, and protective measures should be taken for the welding arc.
④ The oil used in operation machinery shall not be dumped at will to prevent pollution.
⑤ Waste materials, steel materials, welding heads, welding wire heads, etc. left over during operation should be collected separately, treated or recycled in a unified manner.
Introduce the influencing factors in the installation of pipeline construction equipment.
l Bracket installation quality
In the installation of pipeline construction equipment, the installation of the bracket is relatively important, which plays a very good role in the quality of pipeline installation and the normal operation of the equipment. Among them, the installation of the bracket has a certain impact on the overall performance of the pipeline.
For example, the carrying capacity of the scaffold must meet the standard, the sliding surface of the support and the supporting surface have good connection performance, etc. Therefore, the pipeline construction process needs to be carried out according to the engineering construction drawings and pipeline construction equipment installation and construction process specifications to avoid installation Quality has a certain impact.
l Welding quality
Welding in the installation of pipeline construction equipment is also one of the necessary links. The quality of welding affects the overall quality of pipeline installation. Pipe welding can ensure the performance of the undertaking project frame group, thereby ensuring the overall performance of the pipeline. Therefore, precise welding is required in welding, positioning welding position to ensure welding quality, and welding in strict compliance with welding procedures and specifications.
In welding, especially the position of the welding seam, the welding process requirements of the welding workers are very high. The relevant personnel are required to do a good job in welding quality control in this link, and to formulate specific solutions for possible situations to avoid The overall performance of pipeline construction equipment has a certain impact.
l Pipeline anticorrosion
The particularity of the use environment of pipeline construction equipment and the particularity of the use location require the pipeline to have certain anti-corrosion performance. In the pipeline anti-corrosion, the anti-corrosion material will choose paint, and the economical and reasonable pipeline paint can be selected for pipeline anti-corrosion in the process of use.
To reduce the risk of pipeline construction equipment being corroded, paint itself is a corrosion-resistant substance, which is an industrial raw material and anti-rust material for construction. Applying a layer of paint on the surface of the pipeline can extend the service life of the pipeline.
We also have many products about Hydraulic jacking system and Pipe spool fabrication solution, welcome to consult us!
We are professional pressure vessel production line supplier,If you need the related equipment,please provide following information:the material and the size of workpiece.It would be better if you could provide drawings of the workpieces.Thanks.
The advantage of pressure vessel production line:
1) .Save manpower cost and time cost, reduced project time greatly;
2) .The operation is simple, and the mechanized operation is safer;
3) .Have very strong practical, and standardized process products more in line with international standards;
4) .Strong applicability, and through the customization can achieve the requirements of different specifications of the workpiece.
The entire pressure vessel production process:
1.The process of single tower barrel:
❶Storage area of raw materials→❷Numerical control cutting machine→❸Steel plate rolling-up machine→❹Single barrel assembling and welded area→❺Flange fit-up welding zone→❻Inspection of semi-manufactured products→❼Storage area of semi-manufactured products→❽Lengthened installed and welded workshop.
2.The process of multi-section tower barrel:
❶Preparation for the supplied materials of work area→❷Hydraulic fit-up system→❸Inner circular seam automatic welding→❹Outer circular seam automatic welding→❺Inspection of semi-manufactured products→❻Delivery of rotator→❼Sandblasting and painting zone.
3.The process of tower barrel sandblasting and painting zone:
❶Lengthened tower barrel→❷Travel rotator→❸Tower barrel sandblasting→❹Tower barrel painting→❺Storage yard of finished product
Simple chain type hydraulic jacking system is composed of one-stage double-acting hydraulic cylinder, pulley block, load-bearing chain and oil way etc. Moveable pulley is used to enlarge chain stroke, i.e. traveling distance of the cylinder is 1/2 of lifting distance of the chain. It applies to inverted installation and construction of various large storage tanks (steel) and various storage tanks.
LYT-type simple chain type hydraulic jacking system includes the following models: LYT-120-2700, LYT-200-2700, and LYT-300-2700 etc. (those with special stroke need to be customized).
What is the operation process of the simple chain type hydraulic jacking system?
What is the working principle of the simple chain type hydraulic jacking system?
What are the advantages of simple chain type hydraulic jacking system?
LYT-type simple chain type hydraulic jacking system is used to firstly lift the tank roof and the top (first layer) siding of the tank. It's required to group weld tank siding when the lifting height of siding exceeds the second siding (the second layer from the top) by 30-50mm, and group weld the third layer (the third layer from the top to the bottom) of the tank after lifting again, lift successively, group weld the siding of the tank layer by layer, until the last layer of siding.
LYT-type simple chain type hydraulic jacking system is used for lifting. When oil enters the hydraulic jack, the movable pulley is pushed upward by pressing the piston, thus driving the load-bearing chain to lift the expansion ring. In this way, the whole tank (including tank roof) is lifted up, until it reaches the pre-set height (there is a voidance of the next layer of plate). The siding in this layer is surrounded for butt welding. After the positioning block is welded, hydraulic hoist returns and the lift tank falls back to the newly-surrounded siding. After welding of circular seam and vertical seam, the door-type card for fixing expansion ring is cut off and the expansion ring is released. In this way, the hoist returns and expansion ring falls to the Model of hydraulic pump station Tank volume Rated pressure Rated flow Power Control voltage of solenoid valve Motor drive rate YB-7.2 220L (700*550*580) 25Mpa 7.2L/min Three-phase Four-wire (380V) 220V 5.5KW YB-14.5 340L (750*650*650) 25Mpa 14.5L/min 220V 7.5KW Mode of LYT-type hoist Rated lifting capacity (KN) Hydraulic area (mm) Rated oil pressure (MPa) Piston stroke (mm) Chain stroke (mm) Cylinder safety equipment Reinforcement measures LYT-120-2700 120 11304 25 1500 2700 Double-direction oil-way hydraulic lock 2 adjustable pull rods LYT-200-2700 200 18859.6 25 1500 2700 Double-direction oil-way hydraulic lock 2 adjustable pull rods LYT-300-2700 300 25434 25 1500 2700 Double-direction oil-way hydraulic lock 2 adjustable pull rods bottom of tank siding. Then, the next circular plate is expanded and transfer rib plate, such as door-type card, is welded for lifting, and so forth. The group welded tank is lift, until group weld of the last layer of siding, so that the whole storage tank is installed with this inverted method.
1. Simple chain type hydraulic jacking system is stable, safe and reliable. Due to the adoption of unified hydraulic control and single or partial (several) adjustment, the whole lifting process is relatively stable. The hoist is provided with synchronizing valve and hydraulic lock to prevent sliding and falling of the tank or heavy loads, which are caused by power failure and fracture of oil tube. Hydraulic lifting is stable, safe and reliable.
2. Construction quality is ensured. As the hoist is provided with synchronizer and adjustable function, lifting height can be controlled accurately. Due to above reasons, quality of the tank is ensured.
3. The simple chain type hydraulic jacking system is easy to operate. Construction environment is good and work efficiency is high.
4. The simple chain type hydraulic jacking system is well-adapted. As long as the number of hydraulic hoists is increased or decreased, the whole set of equipment can be applied to the inverted hydraulic lifting construction of large storage tanks with different volumes ranging from several thousand cubic meters to tens of thousands cubic meters.
5. The hydraulic pump station and the hydraulic hoist are placed in the tank for easy operation. Finally, a door-closing plate is reserved to move the equipment out of the storage tank, and the door-closing plate is group welded well.
6. The hydraulic pump station can be controlled singly or jointly, and has strong construction adaptability and excellent technical performance price ratio.
7. Short construction period, low cost and good economic benefit. Due to the high degree of modernization and the fast lifting speed of the complete set of equipment, it has low construction cost and good economic benefit. This technology is truly characterized with convenient and centralized control, simple operation, safety and reliability (no falling), accurate control of weld clearance and lifting height of heavy objects, which can ensure the quality of the project, save labor and reduce costs, and achieve remarkable economic benefits.
Wincoo Engineering Co.,ltd is a hydraulic machinery manufacturing company integrated with design, development, production and sales, which mainly manufactures LYT-type chain-type hydraulic hoist, SQD unfixing holding-latch hydraulic hoist and supporting products. Such products are mainly used for inverted lifting and installation of steel storage tanks. Founded in 2003, after years of concentrated scientific research and development, the company obtained the patent certificate of "Utility Model Hydraulic Hoist' issued by "China National Intellectual Property Administration", and the right to use the trademark of "WINCOO" in 2008, so as to enable products of Wincoo Engineering Co.,ltd to quickly become Chinese brands.
Hydraulic storage tank lifting equipment is a jack that uses a plunger or a hydraulic cylinder as a rigid jacking member. It has compact structure, stable operation and self-locking function.
How to properly maintain the hydraulic storage tank lifting equipment?
What reasons may cause the hydraulic storage tank lifting equipment lift to fail?
How does hydraulic storage tank lifting equipment work?
1) The hydraulic storage tank lifting equipment uses oil as the medium, so the maintenance of the oil and the equipment must be done well to avoid blockage or oil leakage, which will affect the use effect.
2) For a new or long-established hydraulic storage tank lifting equipment, since there is a lot of air in the hydraulic cylinder, when it starts to use, the piston rod may have a small jump phenomenon, and the hydraulic storage tank lifting equipment can be reciprocated with no load. 2 to 3 times to remove the air in the cavity. The hydraulic storage tank lifting equipment that has been idle for a long time will harden due to the long-term non-working of the seal, which will affect the service life of the hydraulic jack. Therefore, when the hydraulic storage tank lifting equipment is not in use, it should be reciprocated 2 to 3 times a month with no load.
1. If the gear pump of the hydraulic storage tank lifting equipment lift is damaged, and the pumped oil has no pressure, it cannot be lifted, and the lift gear pump should be replaced.
2. The support valve or electromagnetic reversing valve of hydraulic storage tank lifting equipment lift fails to operate, and a new support valve or electromagnetic reversing valve needs to be replaced.
3. The manual pump and gear pump of the hydraulic storage tank lifting equipment lift leak oil. If the oil leak is serious, it will lead to insufficient power, and the sealing ring of the lifting oil pump needs to be replaced in time.
4. The circuit of hydraulic storage tank lifting equipment lift is open circuit. The hydraulic system is controlled by the circuit. If the circuit is short-circuited or open, it will also cause it to fail to lift. It is necessary to check the lift button contactor and fuse and other parts.
5. The check valve of the manual pump of the hydraulic storage tank lifting equipment lift is stuck and the return position fails. This kind of failure is more troublesome. The solution is to unscrew the oil pump valve port bolt, repair, clean, and replace the clean hydraulic oil.
The principle of hydraulic storage tank lifting equipment is based on Pascal's principle, that is, the pressure of the liquid is the same everywhere so that in a balanced system, the pressure exerted on the smaller piston is relatively small, and the pressure exerted on the larger piston is also relatively large to keep the liquid still.
Therefore, the hydraulic storage tank lifting equipment can obtain different pressures on different ends through the transmission of the liquid, so that a transformation purpose can be achieved. The hydraulic storage tank lifting equipment we see commonly uses this principle to achieve force transmission.
WINCOO ENGINEERING CO., LTD has committed to providing the most suitable hydraulic storage tank lifting equipment at a reasonable price, and whatever it takes to satisfy the customer’s needs.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong