Step 1: Remove the hydraulic jacks and support
Step 2: Load the hydraulic jacks
Step 3: Tighten the bolts and nuts
Step 4: Remove the base plate and bolts
Step 5: Install the baseplate
Step 6: Install the cable-stayed plate
Step 7: Install the first square tube
Step 8: Install the second square tube
Step 9: Install the third square tube
Step 10: Install connecting plate
Step 11: Install the jacking block
Step 12: Installation is complete
In recent years, we have received a lot of customer demand, they want to have a special hydraulic roof for lifting granaries and enamel tanks.
Discover how WINCOO's advanced pipelayers are transforming pipeline projects with unmatched power, precision, and versatility. Built for durability and efficiency in the most challenging environments.
Embrace the future of construction with our intelligent pipelayers. Featuring automation, GPS guidance, and data connectivity for unprecedented efficiency and accuracy on your pipeline job site.
WINCOO ENGINEERING CO.,LTD delivers robust CNC beveling solutions engineered for the rigorous demands of pipeline prefabrication. Ensure your weld success starts here.
WINCOO ENGINEERING CO.,LTD provides the advanced CNC beveling solutions that leading pipeline fabricators trust. Explore our range of machines designed specifically for high-volume prefab excellence.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong