Views: 0 Author: Site Editor Publish Time: 2025-11-20 Origin: Site
Is your industrial tank maintenance project being delayed by the challenges of safe and precise lifting? The process of elevating massive storage tanks for inspection, repair, or pad replacement is a high-stakes operation where failure is not an option.
At WINCOO Engineering Co., Ltd., we engineer strength and intelligence into every tank lifting project. Our advanced Screw Jack Lifting Systems are designed to provide the ultimate solution for controlled, stable, and synchronized heavy lifting.
Uncompromising Safety: Our systems are built with multiple safety locks and fail-safe mechanisms. We prioritize the protection of your assets and personnel, ensuring a secure lifting process from start to finish.
Superior Load Capacity & Stability: Engineered from high-strength materials, our screw jacks handle extreme loads with ease. The non-hydraulic, mechanical design prevents sudden drops, offering unmatched stability even under full capacity.
Pin-Point Synchronization: Using our state-of-the-art centralized control system, multiple jacking points can be operated in perfect harmony. This eliminates the risk of structural stress or damage to the tank shell, guaranteeing a perfectly level lift every time.
Durability for Demanding Environments: Corrosion-resistant and built to withstand harsh industrial conditions, HUIKE WINNER equipment delivers long-term reliability and a low total cost of ownership.
Storage Tank Base & Foundation Repair
Tank Re-location and Installation
Scheduled Inspection & Maintenance
Bottom Plate Replacement
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong