Storage tank jacking system is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank. I will give you a detailed introduction of the storage tank jacking system.
What are the applications of storage tank jacking system?
What are the features of storage tank jacking system?
What are the types of storage tank jacking system?
1.The hydraulic jacking system are mainly used for vertical tank top to bottom construction.
2.Also it can be used for mega work piece jacking or lifting.
1.The system consists of hydraulic pump station, cylinders, steel wire, and strokes. Easy to installation and operation;
2.The system utilizes PLC central control to handle lift. Each power pack is equipped with auxiliary balance device to guarantee the precision of simultaneously lifting.
3.Hydraulic jacking system pump station has subsidiary manual control and central control two operation models. The cylinder can be adjusted to lift separately or to lift with several others as one group, and multi groups can also be integrated to lift reach better precision and better welding effect.
4.All the cylinders are with safety valve. It can be automatically locked to avoid cylinder/ tank dropping even under situation of power off, high-pressure hose broken, burst.
5.The cylinder is with one high pressure hose to avoid oil leaking that usually happen by the traditional multiple hoses. Cylinder will return to initial condition by itself weight.
6.Stroke of Hydraulic cylinder is 1475mm, which can satisfy each annular shell with 2500 plate one-step lift. Greatly reduce the time waste.
7.Hydraulic cylinder basic height is 2050mm, which can match automatic girth welding machine to proceed internal girth seam welding.
8.Module configuration, the hydraulic jack quantity can be adjusted as per different size of tank and weight
9.High efficiency, each time lifting or falling down only needs around 15 minutes.
10.Can well cooperate with our tank welding machines, which can greatly reduce the manpower cost and reduce the construction time; Usually one Horizontal seam welding machine can match 6-10 skilled welder. Vertical seam welding machine can match around 20-30 people skilled welder and butt/fillet welding tractor can match 6-15 skilled welder.
At present, we have three types of hydraulic jacking system in WINCOO Engineering Co., LTD. They are the following three: Advanced hydraulic jacking system, Simple unfixing Holding -latch hydraulic Jacking system and Simple chain type hydraulic jacking system.
Storage tank jacking system is mainly used in large tank construction. WINCOO ENGINEERING CO.,LTD is supplying storage tank jacking system to tank contractors worldwide.
The use of pipeline construction equipment is inevitable in the chemical industry. Pipeline installation is an inevitable part of project construction. However, the installation of pipeline construction equipment requires a certain degree of professionalism and pertinence. Relevant departments need to strengthen industrial management and do a good job of quality control of pipeline installation , Lay a solid foundation for my country's industrial development.
Here is the content list:
l Introduce the basic information of pipeline construction equipment.
l Introduce the safety and environmental protection measures of pipeline construction equipment.
l Introduce the influencing factors in the installation of pipeline construction equipment.
Introduce the basic information of pipeline construction equipment.
l Main material
Q345 steel plate, submerged arc welding wire, electric welding rod, two protection welding wire, CO2 gas, oxygen, acetylene gas, carbon rod.
l Machines and equipment
Electronic goniometer, steel tape measure, weld ruler, square ruler, non-destructive flaw detector, multi-head automatic cutting.Machine, assembly machine, DC arc welding machine, automatic submerged arc welding machine, CO2 gas shielded welding machine, creasing machine, radial drilling machine, radial drilling machine, planer, medium-sized oven.
l Quality Control
In accordance with the construction quality management system of pipeline construction equipment, establish quality acceptance standards for finished components of processing plants. Prepare the corresponding technical plan before processing, organize the management and operation personnel involved in processing to carry out training, so that the relevant operators can fundamentally solve the problems existing in the process of processing pipeline construction equipment.
Introduce the safety and environmental protection measures of pipeline construction equipment.
The use of pipeline construction equipment can effectively guarantee the processing quality of steel crane beams, reduce the amount of correction work, reduce production costs, speed up the production rate, and reduce the adverse effects on the welds caused by measures such as the fixed and mandatory correction of semi-finished products during the processing , It has a positive effect on the improvement of the processing technology of steel crane beams.
l Safety measures
Before making steel crane beams, a processing plan or processing technology should be prepared, corresponding safety technical guarantee measures should be formulated, and safety technical clarifications should be made.
① Operators must be familiar with the safety operating procedures of machinery and equipment in the production of pipeline construction equipment and the safety technical operating procedures of this type of work, and operate in strict accordance with the procedures for safe operations.
② The electricity consumption of the production workshop or site must be managed by a full-time electrician and hold a certificate.
③ The electric oxygen welder must obtain the corresponding electric welder qualification certificate.
④ Materials, semi-finished products, and finished products should be slowly and steadily lifted during production, turning over, and lifting.
⑤ Place it to prevent bumping or falling over and crushing people. Lifting personnel must have corresponding qualifications.
⑥ All workers wear protective equipment as required.
⑦ All kinds of pipeline construction equipment must have good grounding and zero connection.
⑧ Establish a full-time safety officer to conduct safety inspections and inspections on the work site, and find unsafe factors, promptly propose and implement corrective measures.
l Environmental protection measures
The installation of pipeline construction equipment is one of the necessary steps in the industrial field, and the installation and construction of pipeline construction equipment is a very important stage in project construction.
Due to the influence of various factors during project construction, there are many problems in the installation of pipeline construction equipment. In order to promote the improvement of industrial pipeline installation quality, certain measures need to be taken to control the pipeline installation quality to ensure the smooth completion of project construction.
① The construction site should be kept clean. All items should be arranged in time and placed in an orderly manner.
② Noise should be controlled during operation, and operation time should be arranged reasonably to reduce the impact on the surrounding environment.
③ The working lights at night should be irradiated into the field, and protective measures should be taken for the welding arc.
④ The oil used in operation machinery shall not be dumped at will to prevent pollution.
⑤ Waste materials, steel materials, welding heads, welding wire heads, etc. left over during operation should be collected separately, treated or recycled in a unified manner.
Introduce the influencing factors in the installation of pipeline construction equipment.
l Bracket installation quality
In the installation of pipeline construction equipment, the installation of the bracket is relatively important, which plays a very good role in the quality of pipeline installation and the normal operation of the equipment. Among them, the installation of the bracket has a certain impact on the overall performance of the pipeline.
For example, the carrying capacity of the scaffold must meet the standard, the sliding surface of the support and the supporting surface have good connection performance, etc. Therefore, the pipeline construction process needs to be carried out according to the engineering construction drawings and pipeline construction equipment installation and construction process specifications to avoid installation Quality has a certain impact.
l Welding quality
Welding in the installation of pipeline construction equipment is also one of the necessary links. The quality of welding affects the overall quality of pipeline installation. Pipe welding can ensure the performance of the undertaking project frame group, thereby ensuring the overall performance of the pipeline. Therefore, precise welding is required in welding, positioning welding position to ensure welding quality, and welding in strict compliance with welding procedures and specifications.
In welding, especially the position of the welding seam, the welding process requirements of the welding workers are very high. The relevant personnel are required to do a good job in welding quality control in this link, and to formulate specific solutions for possible situations to avoid The overall performance of pipeline construction equipment has a certain impact.
l Pipeline anticorrosion
The particularity of the use environment of pipeline construction equipment and the particularity of the use location require the pipeline to have certain anti-corrosion performance. In the pipeline anti-corrosion, the anti-corrosion material will choose paint, and the economical and reasonable pipeline paint can be selected for pipeline anti-corrosion in the process of use.
To reduce the risk of pipeline construction equipment being corroded, paint itself is a corrosion-resistant substance, which is an industrial raw material and anti-rust material for construction. Applying a layer of paint on the surface of the pipeline can extend the service life of the pipeline.
We also have many products about Hydraulic jacking system and Pipe spool fabrication solution, welcome to consult us!
The hydraulic storage tank lifting equipment has a slow lifting speed but is safe and durable, and its carrying capacity is also very amazing. It is the choice of many businesses.
What is the function of hydraulic storage tank lifting equipment?
Why can't the hydraulic storage tank lifting equipment lift?
What are the contraindications to the use of hydraulic storage tank lifting equipment?
T series hydraulic storage tank lifting equipment is large-scale equipment specially developed for the national petroleum reserve project, which is suitable for the inverted welding process engineering of steel giant silos. This type of device is a two-stage single-acting hydraulic cylinder (hydraulic jack) for VTOL workforce or needs to be returned from the back position, it cannot be used for horizontal work. The device is compact in structure, safe and stable, easy to operate, adjustable in load, quick in installation and high in synchronization accuracy. YT series hydraulic storage tank lifting equipment is a "drag five" oil supply method: each pump station is connected to 5 hydraulic cylinders; thus, avoiding the disadvantages of excessive oil pipes and many leakage points caused by traditional centralized oil pipes, and ensuring that environmental pollution is minimized.
There is no oil inside, the small pump gasket cannot move against the steel ball or there are impurities or damage in the recess of the steel ball.
1. Observe whether there is oil in the hydraulic storage tank lifting equipment, and refuel without oil.
2. Clamp the hydraulic storage tank lifting equipment on the vise, remove the handle connecting rod on the small pump, tighten the oil drain valve, and release the air from the oil filling port, loosen the small pump counterclockwise with the afterburner lever of the plum wrench. Use needle nose pliers to pry out the gasket, take out the steel ball, clean the recess, put in the gasket, observe whether there is room for the steel ball to move, and then install it back into the small pump and tighten it.
(1) No overload, super high. When a red line appears on the sleeve, it indicates that the hydraulic storage tank lifting equipment has reached the rated height and should stop lifting.
(2) When several hydraulic storage tank lifting equipment are working at the same time, there must be a special person instructing them to make the lifting or lowering synchronously. Wooden blocks should be supported between two adjacent hydraulic jacks to ensure the interval and prevent sliding.
(3) When using the hydraulic storage tank lifting equipment, always pay attention to the sealing part and the pipe joint part, and it must be safe and reliable.
(4) hydraulic storage tank lifting equipment is not suitable for places with acid, alkali or corrosive gas.
Our company has a skilled team that can customize exclusive products for you according to the different needs of customers. If you are interested in this product and want to know more about it, please contact WINCOO ENGINEERING CO., LTD.
Simple chuck type hydraulic Jack is a double acting hydraulic jack (also known as hydraulic lifting machine) with upper and lower clamping heads divided into two bodies. It is suitable for lifting construction of various large storage tanks (steel) or other heavy objects. It needs to cooperate with the lifting rod to achieve reciprocating lifting work.
What do you know about simple chunk type hydraulic jack?
What is the working principle of the simple chunk type hydraulic jack?
What are the characteristics of simple chunk type hydraulic jack?
The simple chunk type hydraulic jack comprises an oil cylinder and a piston, the upper and lower ends of the oil cylinder are respectively provided with an upper cylinder head and a lower cylinder head, and the upper cylinder head and the lower cylinder head are respectively provided with an oil inlet and outlet hole; The piston is arranged in the middle of the piston rod, the both ends of the piston rod respectively extend out of the upper cylinder head and the lower cylinder head, the piston rod is hollow, and the lifting rod axial through the piston rod, the lifting rod on the upper side and the lower side of the piston rod are respectively provided with a locking device; The locking device comprises a gripping part set on the lifting rod, the gripping part is provided with a large and small conical hole, the inner side of the conical hole is circumferentially provided with a number of wedge blocks; The outer surface of the wedge block is compatible with the conical hole, the inner side of the wedge block is provided with a clamping tooth, the clamping tooth is held on the lifting rod, the wedge block is provided with a circular spring chuck; The spring chuck is provided with a plurality of round holes, a round hole is provided with a reset spring, the upper side of the spring chuck is provided with an annular cover fixed with the grip part, and the both ends of the reset spring are respectively conflicted between the lower end face of the wedge block and the cover; The grip part on the upper side of the locking device is relatively fixed with the upper end of the piston rod, and the grip part on the lower side of the locking device is relatively fixed with the lower cylinder head by the support.
Simple chunk type hydraulic jack (package unit) is evenly distributed around tank inner wall. Tank top and upper (the first layer) wall plates are lifted first and then install and weld wall plates of tank body. Self locking hydraulic jack and hydraulic hoist composing of lifting frame and lifting rod are adopted. When oil enters hydraulic jack, upper clamp fastens and lifts lifting rod and expansion ring and mobilize tank (including tank top) to ascend upward. When oil returns to jack, upper clamp returns with piston and lower clamp automatically fastens lifting rod without gliding. The simple chunk type hydraulic jack repeats the movement and make lifting rod ascend with tank to designated height (spare height for next layer of plate). After butt weld of next layer of wall plates, open upper and lower loosening device and loosen upper and lower clamp to make lifting rod and expansion ring descend to lower expanded and welded rib plate of the next layer of wall plates and then lift. Repeat the process and ascend welded tan till the last layer of wall plates are installed and welded. The installation of the whole storage tank is completed.
1, Simple chunk type hydraulic jack adopts low relaxation steel strand, as long as there is a reasonable bearing lifting point, lifting height is not restricted;
2, Through the expansion and combination of simple chunk type hydraulic jack, the lifting weight, span and area are unlimited;
3, Small volume, light weight, large bearing capacity, convenient and flexible installation, especially suitable for small space or indoor large tonnage tank lifting;
4, The simple chunk type hydraulic jack has reverse motion self-locking, which makes the lifting process very convenient, and the storage tank can be locked reliably at any position in the lifting process for a long time;
5, The simple chunk type hydraulic jack has a high degree of automation, convenient and flexible operation, with automatic operation, semi-automatic operation, single point adjustment, manual operation and other operations. LCD display, touch screen display, button operation panel display, very intuitive. And the control system is equipped with self-correction protection procedures, even if the misoperation will not cause accidents;
6, Using this series of simple chunk type hydraulic jack, the construction period is short, the cost is low, the economic benefit is good.
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipment for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction, industrial production lines, clean energy project and other industrial field.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong