Tank hydraulic jacking system is mainly a closed or meshed hoistway enclosed by buildings or light steel structures and hydraulically driven cylinders to lift the platform.
Here is the content list:
l What are the components of installing a tank hydraulic jacking system?
l What are the performance characteristics of installing tank hydraulic jacking system?
l How to install tank hydraulic jacking system?
Tank hydraulic jacking system is mainly a closed or meshed hoistway enclosed by buildings or light steel structures and hydraulically driven cylinders to lift the platform. Its main components are:
1. Hoistway part: a closed or net-like frame enclosed by a building or light steel structure, with steel guide rails installed on both sides of the inside
2. Driving part: a small oil tank hydraulic jacking system with hydraulic components such as hydraulic driving motor, oil pump, safety valve, speed control valve and reversing valve
3. Oil cylinder part: it is composed of one or more tank hydraulic jacking system of the lifting oil cylinder straight-top platform or jacking scissor frame
4. Door system: It is a closed or net-shaped platform door or landing door system composed of steel structure. There are manual doors and automatic doors. Generally, open platforms do not have doors.
5. Electrical part: it is composed of power, control, signal, safety and lighting devices
6. Platform part: It is a steel structure platform that carries heavy objects. It has a closed type (ie car type) or an open type. Both sides are equipped with guide rollers or guide shoes. The bottom of the platform can be connected with a lifting cylinder or a lifting scissors steel frame
7. Auxiliary part: it is composed of hydraulic pipe fittings, pipelines, pressure gauges and steel structure base
8. Safety device: safety valve, limit limit, door electromechanical interlock, rupture valve, emergency switch and electrical short circuit protection, etc.
The tank hydraulic jacking system is generally equipped with safety protection devices such as anti-falling, overloading, power failure, etc., rail-type external power unit, using hanging chains or cross bars at the entrance and exit of the table, guardrails and lifting platform operating warning lights or warning bells, when the door is opened Many functions such as a safety switch to close the circuit of the elevator platform. It is extremely convenient and convenient for the operator to control multiple points in each working layer, and operate in jog or safe mode.
The large carrying capacity, stable lifting, simple and convenient installation and maintenance, and it is an economical and practical low-floor elevator to replace the ideal cargo conveying equipment. According to the installation environment and use requirements of the tank hydraulic jacking system, different fixed hydraulic jacks can be selected, and different optional configurations can be selected to complete the task of lifting objects and achieve better results.
If the tank hydraulic jacking system requires a large size, a fixed double-span hydraulic lift can be used. The double-span type has stable lifting, large carrying capacity and simple operation. It is widely used in vehicle maintenance, kilns, chemical plants, equipment supporting, etc. Industry use.
The tank hydraulic jacking system is suitable for installation and use under various environmental conditions indoors and outdoors. The tank hydraulic jacking system can be installed in a closed hoistway or between open floors, in a concave foundation pit or on a flat ground according to the requirements of use.
Due to the height of the building or work shelf, the size and weight of the objects carried, and other usage requirements, there are many uncertain factors in the tank hydraulic jacking system model. When the models shown in the list are not suitable for use requirements, the elevation, carrying capacity, platform area, etc. of the lifting platform can be combined according to the actual use environment and operating requirements to achieve the desired use effect.
What is more? WINCOO also provide customers with vairous pipeline construction solutions!
With the continuous development and progress of my country’s science and technology, my country’s demand for oil and gas resources has become greater and greater. In order to promote the development of my country’s economic construction and meet people’s normal lives, ground construction is an important link in the process of oilfield development and exploration to ensure production The key means of safety, especially the installation of pipeline construction equipment and the construction technology of gathering pipelines, play an important role.
Here is the content list:
l On the characteristics of the corporate piping system.
l About the characteristics of pipeline construction equipment welding.
l Analyze the causes and characteristics of common problems during welding of pipeline construction equipment.
On the characteristics of the corporate piping system.
Among all the equipment in power plant operation, pipelines are one of the most indispensable equipment, which are concentrated in EH oil pipelines, lubricating oil pipelines, jack shaft oil pipelines and boiler fuel oil pipelines. Such pipelines are generally ordinary 20 steel. Or 18-8 type stainless steel material, the related pipeline construction equipment has rich specifications and small pipe diameter.
The number of welds on the upper level of pipeline construction equipment is relatively large, and at the same time they are densely distributed; some pipeline welds are not easy to find and are relatively hidden, which often causes some problems during welding operations; especially stainless steel, which is high in chromium. Alloys and material types are unusual. Usually, when pipeline construction equipment is used, relatively large intergranular corrosion and hot cracking will occur, and the difficulty coefficient when completing welding work is relatively large.
About the characteristics of pipeline construction equipment welding.
Welding of pipeline construction equipment requires argon arc welding. For oil pipelines with a diameter of less than 60 mm or a thickness of 5 mm, the welding process for pipeline construction equipment can be full argon arc welding; if the diameter of the pipeline is greater than 60 mm If the thickness is greater than 5 mm, the relevant technicians need to change the welding process to argon arc welding bottom arc welding cover.
The key reason for this is that in stainless steel, the content of cr is already above 13%. A little carelessness will cause oxidation or excessive burning of the welding root. Therefore, when welding pipeline construction equipment, it is necessary to Argon filling or mixing of inert gas is carried out inside, so as to achieve the protective effect and ensure the welding construction quality of pipeline construction equipment.
Analyze the causes and characteristics of common problems during welding of pipeline construction equipment.
In recent years, some power plants have been shut down due to pipeline weld leaks or due to the quality of system welds. The existence of such phenomena will not only have a very bad impact on the overall operation, but also make the safety of the plant fall into threat situation.
In the construction of pipeline construction equipment welding engineering, there are two defects in welding, namely surface and internal defects. Surface problems can be discovered by the naked eye, but internal defects cannot be discovered in time by only relying on the senses. At this time, technicians and detection instruments are required to inspect pipeline construction equipment. Only through accurate inspection of the instrument can the problem be clearly known. Where is the root cause.
The welding quality of pipeline construction equipment will have a great impact on the operation of the unit. In other words, if the operation of the unit does not stop, it is probably because the pipeline construction equipment has welding quality problems.
Why do these problems occur in pipeline construction equipment? The reasons can be found from the following aspects:
l Because the pipeline construction equipment design unit only gave the system diagram but not the layout diagram, the construction personnel carried out the construction based on the site conditions and construction experience. The welding technicians did not know the location and quantity of the welding joints, so they could only make visual inspections or estimates based on their own experience. There will be a shortage in the number of weld inspections, which increases the probability of missing weld inspections;
l In the welding process of pipeline construction equipment, relevant technical personnel did not pay much attention to the particularity of the pipeline medium of the oil system, resulting in a low proportion of non-destructive inspections and potential safety hazards;
l When inspecting the welds of pipeline construction equipment, the relevant technicians usually only pay attention to the welds of the main parts and start the inspection, ignoring the inspection of other common welds, which may easily cause omissions;
l There are irregularities in the direction and layout of construction pipelines and brackets of pipeline construction equipment, and even stress and other reasons. As a result, the weld is not only the weakest part of the pipeline, but also the source of the first problem;
l Because the construction period of pipeline construction equipment is tight or there are requirements on the schedule, some who do not have welder skills or do not hold welder certificates will also temporarily serve as welding technicians. Such personnel who have not received professional welding training usually operate They are all conventional and ordinary welding skills. In the welding operation of pipeline construction equipment, there are problems such as insufficient sense of responsibility and low attention. At the same time, the quality of the plumber’s counterpart is not up to the standard and the awareness is relatively weak. Such problems will lead to pipeline construction equipment. There are quality problems and safety hazards in the weld joints.
We also have many products about Tank welding machine and Pipe spool fabrication solution, welcome to consult us!
In today's world, pipe spool fabrication lines are very common for almost any application that transports liquid or gas substances. These liquid or gas substances flow in the pipeline system at different pressures and temperatures. Therefore, the pipe spool fabrication line suffers from excessive stress caused by pressure and temperature. So how to use pipe spool fabrication line correctly?
Here is the content list:
l What is the solution for pipe spool fabrication line?
l Choose WINCOO to solve the related problems of pipe spool fabrication line.
l What are the steps to use the pipe spool fabrication line purchased by WINCOO?
What is the solution for pipe spool fabrication line?
The pipe spool fabrication line must be designed and produced in a way that can handle the stress caused during the transportation of liquid or gas substances. Some facilities (power plants, oil refineries, etc.) require lengthy and complex piping systems.
Moreover, due to the limited working space of the pipe spool fabrication line, these types of facilities deal with problems. The pipe spool fabrication line must be produced and installed at the factory site. These complex facilities use spools with different sizes and different components.
The pipe spool fabrication line is a prefabricated part, including pipes, flanges and accessories. Pipe fittings are components that connect complex pipe networks. In addition, pipe spool fabrication line accessories will change the size or dimensions of the pipe system.
Choose WINCOO to solve the related problems of pipe spool fabrication line.
Wincoo Engineering Co., Ltd (WINCOO) is committed to providing customers, manufacturers, EPC/C companies with the most suitable pipe spool fabrication line, involving pipe manufacturing, storage tank construction, pipeline construction, industrial production lines, clean energy projects and other industries field.
WINCOO has the ability to provide a feasible pipe spool fabrication line to support customers in obtaining shorter project execution time, less man-hour costs, more efficient construction/manufacturing methods and higher quality in the project bidding phase.
According to the customer's facility/site space availability, WINCOO can research/design and provide matching configurations in terms of project schedule, quality, cost and productivity to ensure that the pipe spool fabrication line production schedule meets the project requirements.
To support project execution, WINCOO is ready to work as a firefighter to quickly provide project materials from various consumables, tools, equipment/machines to special commodities. With flexibility, we are also very happy to act as a sourcing agent for pipe spool fabrication line in China to find the necessary supply resources!
What are the steps to use the pipe spool fabrication line purchased by WINCOO?
The pipe spool fabrication line consists of seven steps: sandblasting→cutting→chamfering→assembly→welding→nondestructive testing→painting.
1. Sandblasting machine
We need to understand the size, weight, material and cleanliness of the workpiece. Then we can provide you with the right machine.
2. Cutting machine
There are three types of cutting machines, namely band saw cutting machine, five-axis CNC flame and plasma cutting machine and cutting and chamfering machine. We need to know the size, weight, and material of the workpiece. Then we can provide you with the right machine.
l The band saw machine is a cold cutting machine, suitable for carbon steel and stainless steel, with 4 lines of 2-24", 8-32", 12-48" and 24-60". PLC control, fixed length function.
l The five-axis CNC flame plasma cutting machine is a thermal cutting machine, which is suitable for carbon steel and also adopts PLC control.
l Chamfer all the cutting edges as cold cuts, and there are 3 lines in total, 2-16", 2-12" and 2-8" respectively.
3. groove shape
The groove shape of the groove/end face machine has J, U, V, X, etc., which can be controlled by PLC or CNC. Suitable workpiece sizes are 2-16", 4-24", 8-32", 12- 48", 24-48" and 24-60". We need to know the size, weight, and material of the workpiece. Then we can provide you with the right machine.
4. Laminating machine
5. Welding machine
Welding machine, the welding procedure is Root pass→Filling→Capping, there are two welding machines: split type and cantilever type.
6. Non-destructive testing
Non-destructive testing is non-destructive testing, it has three testing methods: RT, UT and X-ray.
7. Paint spraying
Paint spraying is realized through the spray booth. We need to know the size and shape of the workpiece before we can provide you with the right machine.
Hydraulic jacking system is mainly used for inverted construction of vertical cylindrical steel storage tank (hydraulic jacking method) and inverted construction of vertical cylindrical low-temperature storage tank in petrochemical industry.It can also be used for vertical lifting and lifting of super large objects.
What are the main features of the hydraulic jacking system?
1, The system consists of hydraulic pump station, cylinders, steel wire, and strokes. Easy to installation and operation;
2, The system utilizes PLC central control to handle lift. Each power pack is equipped with auxiliary balance device to guarantee the precision of simultaneously lifting;
3, Hydraulic lift pump station has subsidiary manual control and central control two operation models. The cylinder can be adjusted to lift separately or to lift with several others as one group, and multi groups can also be integrated to lift reach better precision and better welding effect;
4, All the cylinders are with safety valve. It can be automatically locked to avoid cylinder/ tank dropping even under situation of power off, high-pressure hose broken, burst;
5, The cylinder is with one high pressure hose to avoid oil leaking that usually happen by the traditional multiple hoses.Cylinder will return to initial condition by itself weight;
6, Stroke of Hydraulic cylinder is 1475mm, which can satisfy each annular shell with 2630plate one-step lift. Greatly reduce the time waste;
7, Hydraulic cylinder basic height is 2050mm, which can match automatic girth welding machine to proceed internal girth seam welding;
8, Module configuration, the jacking system quantity can be adjusted as per different size of tank and weight;
9, High efficiency, each time lifting or falling down only needs around 15 minutes;
10, Can well cooperate with our tank welding machines, which can greatly reduce the manpower cost and reduce the construction time.
Why can we specialize in the production of hydraulic jacking system?
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
1, We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
2, Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
3, To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
What do you want to know most about buying hydraulic jacking system from us?
1. Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time;
2. We can provide all technical documents and advices to support you for construction procedure clearifications;
3. We can calculate the most suitable number of hydraulic jack according to the weight of the tank;
4. We can provide your suitable hydraulic jack accessories with much more competetive price from our long time business partner if you need;
5. We can provide site people training service, and operation service or manpower service or as a subcontractor
If you want to know more about hydraulic jakcing system related information, you are welcome to visit our website
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong