With the progress of social and economic development, people's demand for resources continues to increase, from automobiles that require diesel to power plants that require petroleum. In short, oil, natural gas and other resources have become indispensable things in people's daily life, so people gradually invented pipeline transportation methods. Next, I will introduce pipeline construction equipment in detail.
Here is the content list:
l What are the reasons for using pipeline construction equipment
l What is the specific process of pipeline construction
l What pipeline construction equipment is needed during pipeline construction
Due to the large volume of pipeline transportation, most of the pipelines are buried underground, occupying a small area, less terrain and object constraints, and short transportation distances.
Use pipeline construction equipment for sealed transportation, safe and reliable, long-term continuous and stable operation, easy to manage, easy to maintain, and realize remote centralized monitoring.
Therefore, a large number of pipeline laying work has been carried out in various countries, and related companies specializing in pipeline construction equipment have been derived. WINCOO is a company specializing in pipeline construction equipment.
There are many factors that can lead to operational defects in pipeline construction, such as inadequate installation technology, long construction period or insufficient supervision. Relevant technical personnel should be careful, careful, and concentrate on research and judgment when inspecting and accepting pipeline construction equipment.
Provide feedback and resolve the issue as quickly as possible. If the existing safety quality is not reached, the target area should be immediately compensated to ensure that the pipeline construction equipment can continue to operate safely. And maintain the original economic cost.
Specific process introduction:
Measuring arrangement→cleaning the construction work area; construction road→conveying anticorrosion pipe→processing tank→distributing pipe→preparing nozzle; pipeline assembly→pipe assembly and welding→welding joint inspection→heat shrinkable casing (tape) bushing→ trench excavation →Appearance repair.
The following pipeline construction equipment is needed during pipeline construction:
l Transport anticorrosive pipe
l Pipe assembly
l Pipe assembly and welding
l Heat shrinkable sleeve (tape) bushing
With the continuous development of society, the demand for pipelines is also increasing, and the pressure on pipelines is increasing. During the installation and operation of pipeline construction equipment, welding is a basic technical job and also a vital job.
The safe and stable operation of pipeline construction equipment plays a key role in the overall pipeline operation. Therefore, increasing attention to the construction quality of pipeline construction equipment can lay a solid foundation for the normal operation of the factory!If you want to know more about high-quality pipe spool fabrication lines, you can also contact us at any time.
Hydraulic jacking equipment is a new and special lifting equipment powered by hydraulic oil. By pushing the reciprocating movement of the hydraulic cylinder piston, load conversion is carried out between the upper clamping mechanism connected with the upper end of the piston and the lower clamping mechanism connected with the lower part of the cylinder, so as to realize lifting.The hydraulic jacking equipment is a single-acting two-stage hydraulic cylinder, used for vertical take-off and landing work, return need external force or self-weight back.The equipment is compact, stable, easy to operate, adjustable load, fast installation, high synchronization accuracy.Today we are going to focus on the simple hydraulic jacking system.
1, simple operation, adjustable load, stable equipment lifting, good synchronization effect.
2, good compatibility, greatly saving customers' tooling costs.
3, can cross work with the inner ring automatic welding machine.
1,Pump station (YB-40)
Maximum pressure | 25MPa |
Power | 11KW |
Rated oil flow | 40L/min |
Motor rotate speed | 1470r/min |
Oil tank capacity | 240L |
System temperature | 20-60ºC |
Oil filter precision | 20υm |
Voltage | Main power supply 220V, 3 phase) |
System oil type | L-HM46# antiwear hydraulic oil |
Total weight | 370Kg |
Outsize(mm) | 950*850*820 |
Theory lifting capacity | 123KN |
Rated lift capacity | 120KN |
Rated oil pressure | 18MPa |
Hydraulic stroke | 100±0.5mm |
Glissade capacity | ≤5mm |
Weight | ≤30Kg |
Oil outlet | M16*1.5 |
Installation size for jack base | Settle 4-M16 on the circumference of a φ120 circle |
Installation size for up and down chuck | Settle 3 *16U hole on the circumference of a φ110 circle |
Size(mm) | 138*138*500 |
Suitable lifting rod | φ32round steel(45#) |
Chuck device | Screw mechanism |
3,Jack support (TSJ-120-2600L)
Total height | 3460mm |
Lifting rod height: | 3900mm |
Slider stroke | 2630mm |
Sliding block guide wheel quantity | 4 pcs |
Lifting rod diameter | φ32mm |
distance between expansion loop support to ground | 310mm |
Size(mm) | 3900*300*300 |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
1. Support you to win the project during bidding phase. We can provide your more suitable configurations to help you shorten the constrcution time.
2. We can provide all technical documents and advices to support you for construction procedure clearifications
3. We can calculate the most suitable number of hydraulic jack according to the weight of the tank
4. We can provide your suitable hydraulic jack accessories with much more competetive price from our long time business partner if you need.
5. We can provide site people training service, and operation service or manpower service or as a subcontractor.
Please click on our website for more information.Thank you!
The installation of pipeline construction equipment is one of the necessary parts in the pipe construction solution, and the installation and construction of pipeline construction equipment is a very important stage in project construction. Due to various factors in the project construction, there are many problems in the installation of pipeline construction equipment. To promote the improvement of the quality of industrial pipeline installation, certain measures need to be taken to control the installation quality of pipeline construction equipment to ensure the smooth construction of the project.
Here is the content list:
l Regarding the quality inspection of pipeline construction equipment installation.
l What are the quality control measures in the installation of pipeline construction equipment?
l Regarding the quality control of pipeline construction equipment after construction.
The sequence of installation of pipeline construction equipment is:
Measuring arrangement→cleaning the construction work area; construction road→conveying anticorrosion pipe→processing tank→distributing pipe→preparing nozzle; pipeline assembly→pipe assembly and welding→welding joint inspection→heat shrinkable casing (tape) bushing→ trench excavation →Appearance repair .
After the installation of pipeline construction equipment is completed, quality inspection is required. After pipeline construction equipment is installed and put into use, regular monitoring is required. Generally, radiographic inspection is used to inspect the quality of pipeline installation. This monitoring has a very good effect on the internal inspection of welded joints. It is widely used in the field of construction equipment installation. This method can also be used to make the quality of the pipeline meet the assessment standard.
Before installing pipeline construction equipment, clarify the construction plan of the construction technicians, use GB/T as the standard, and carry out construction in accordance with national standards and specifications; during the installation of pipeline construction equipment, strictly review the drawings for defects to ensure the rationality of the drawings, and the construction unit It is also necessary to make preparations for pipeline installation and construction, pipeline lumber, welding inspection, construction site management, etc.
Strictly follow the relevant requirements of pipeline construction equipment and pipeline construction requirements to improve the quality of construction. In order to ensure the quality of pipeline installation, quality control is required for key parts such as welding materials, welding processes, and welding seams to ensure pipeline construction equipment. Welding consumables, brands, specifications, etc. are required by the plan design, which are consistent with the project construction requirements to ensure the quality of installation.
① After the pipes, accessories and raw materials used for pipeline construction equipment enter the construction site, the supervisors shall check and accept them on site, and store the materials after passing the acceptance.
② Pipe joints and semi-finished products of pipeline construction equipment should be guaranteed not to be damaged during transportation and storage. When unloading, handle with care and not collide with each other; choose a flat place for stacking pipe joints.
③ The storage temperature of the rubber ring of pipeline construction equipment is between -5 and 30 degrees Celsius. It should not be exposed to ultraviolet light source and keep away from the heat source; the rubber ring and the items that easily affect the rubber ring should not be put together. If the pipeline construction equipment is being constructed In winter, hard rubber rings are not allowed.
④ For trench excavation in open-cut pipeline engineering, the section should meet the design requirements of construction quality, the original soil at the bottom of the trench should not be damaged, and the mechanical excavation should reserve a 200-300mm soil layer for manual excavation and leveling, and the bottom of the trench can be soaked by water And frost damage, if there is gravel soil, lime soil to backfill, the trench wall should be leveled to meet the requirements of construction design.
⑤ For concrete construction, when the pipe seat and flat foundation are poured in layers, the flat foundation should be shaved and rinsed; the concrete should be prevented from segregation, and the concrete should be cured after pouring.
⑥ When pipeline construction equipment is installed, visual inspection and internal cleanliness of the pipeline must be inspected.
⑦ The flexibility of pipe joints must meet the design requirements, and the rigidity must also meet the requirements.
⑧ In the stage of backfilling, the backfill height between both sides of the pipe and the top of the pipe before the hydraulic test of the pressure pipeline is greater than 0.5M, and the pressure-free pipeline shall be backfilled after the closed water test and the closed gas test have reached the standard.
After the completion of the pipeline construction equipment, the finishing work will begin. The unit needs to organize personnel to review the material documents involved in the pipeline installation, project reports, etc.; after the completion of the project, debugging and quality appraisal are required, and the pipeline professionals are organized to conduct quality appraisal of the installed pipelines. The dynamic control of the links will protect the completed pipelines.
In the later stage of the installation of pipeline construction equipment, in order to ensure the smooth completion of the project, the quality of the pipeline needs to be tested again to ensure that the pipeline installation does not have problems such as tilt and cracks, the welding parts are of good quality, and the pipeline is unobstructed. In the later period after the completion of the project, it is necessary to sort out each project data and work files involved in the pipeline construction, do a good job of archiving and backup to evaluate the quality of the pipeline, do a good job in risk control, and carry out the acceptance of pipeline construction equipment.
There are many influencing factors in the installation of pipeline construction equipmentt, so reasonable measures need to be taken to monitor and control every aspect of pipeline construction equipment. With the continuous expansion of the pipeline construction equipment construction industry, the use area is also expanding. Due to the importance of pipeline use, it is necessary to control the pipeline installation quality to ensure that the installation quality reaches the ideal standard!
What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!
Simple chuck type hydraulic Jack is a double acting hydraulic jack (also known as hydraulic lifting machine) with upper and lower clamping heads divided into two bodies. It is suitable for lifting construction of various large storage tanks (steel) or other heavy objects. It needs to cooperate with the lifting rod to achieve reciprocating lifting work.
What do you know about simple chunk type hydraulic jack?
What is the working principle of the simple chunk type hydraulic jack?
What are the characteristics of simple chunk type hydraulic jack?
The simple chunk type hydraulic jack comprises an oil cylinder and a piston, the upper and lower ends of the oil cylinder are respectively provided with an upper cylinder head and a lower cylinder head, and the upper cylinder head and the lower cylinder head are respectively provided with an oil inlet and outlet hole; The piston is arranged in the middle of the piston rod, the both ends of the piston rod respectively extend out of the upper cylinder head and the lower cylinder head, the piston rod is hollow, and the lifting rod axial through the piston rod, the lifting rod on the upper side and the lower side of the piston rod are respectively provided with a locking device; The locking device comprises a gripping part set on the lifting rod, the gripping part is provided with a large and small conical hole, the inner side of the conical hole is circumferentially provided with a number of wedge blocks; The outer surface of the wedge block is compatible with the conical hole, the inner side of the wedge block is provided with a clamping tooth, the clamping tooth is held on the lifting rod, the wedge block is provided with a circular spring chuck; The spring chuck is provided with a plurality of round holes, a round hole is provided with a reset spring, the upper side of the spring chuck is provided with an annular cover fixed with the grip part, and the both ends of the reset spring are respectively conflicted between the lower end face of the wedge block and the cover; The grip part on the upper side of the locking device is relatively fixed with the upper end of the piston rod, and the grip part on the lower side of the locking device is relatively fixed with the lower cylinder head by the support.
Simple chunk type hydraulic jack (package unit) is evenly distributed around tank inner wall. Tank top and upper (the first layer) wall plates are lifted first and then install and weld wall plates of tank body. Self locking hydraulic jack and hydraulic hoist composing of lifting frame and lifting rod are adopted. When oil enters hydraulic jack, upper clamp fastens and lifts lifting rod and expansion ring and mobilize tank (including tank top) to ascend upward. When oil returns to jack, upper clamp returns with piston and lower clamp automatically fastens lifting rod without gliding. The simple chunk type hydraulic jack repeats the movement and make lifting rod ascend with tank to designated height (spare height for next layer of plate). After butt weld of next layer of wall plates, open upper and lower loosening device and loosen upper and lower clamp to make lifting rod and expansion ring descend to lower expanded and welded rib plate of the next layer of wall plates and then lift. Repeat the process and ascend welded tan till the last layer of wall plates are installed and welded. The installation of the whole storage tank is completed.
1, Simple chunk type hydraulic jack adopts low relaxation steel strand, as long as there is a reasonable bearing lifting point, lifting height is not restricted;
2, Through the expansion and combination of simple chunk type hydraulic jack, the lifting weight, span and area are unlimited;
3, Small volume, light weight, large bearing capacity, convenient and flexible installation, especially suitable for small space or indoor large tonnage tank lifting;
4, The simple chunk type hydraulic jack has reverse motion self-locking, which makes the lifting process very convenient, and the storage tank can be locked reliably at any position in the lifting process for a long time;
5, The simple chunk type hydraulic jack has a high degree of automation, convenient and flexible operation, with automatic operation, semi-automatic operation, single point adjustment, manual operation and other operations. LCD display, touch screen display, button operation panel display, very intuitive. And the control system is equipped with self-correction protection procedures, even if the misoperation will not cause accidents;
6, Using this series of simple chunk type hydraulic jack, the construction period is short, the cost is low, the economic benefit is good.
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipment for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction, industrial production lines, clean energy project and other industrial field.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong