











The old customer in Southeast Asian countries purchased four sets of vertical tank welding machines from us in October this year. This is their second purchase this year. They purchased two sets at the beginning of the year.You should know that they have purchased 8 units last year, and in total, they purchased 14 units from us.
In order to give full play to the advantages of pipeline prefabrication equipment and overcome the limitations of fixed pipe spool fabrication line, we have developed a movable pipe spool fabrication line, which has been used in PetroChina, Sinopec, and China National Chemical Corporation. So, what are the precautions for the quality inspection of the pipe spool fabrication line?
Here is the content list:
l About the quality inspection content of the pipe spool fabrication line.
l The product parameter mark on the pipe spool fabrication line.
l How to inspect the pipe spool fabrication line?
The pipe spool fabrication line consists of a work station for pipe beveling, a work station for pipe mechanical assembly, a work station for automatic pipe welding, a steel structure work station frame that can be quickly disassembled, a trolley railing system and a light rail to form a transportation system.
The testing items of the pipe spool fabrication line include: density, melt mass flow rate, hydrostatic pressure, ring stiffness, flatness, ring flexibility, thermal stability, volatile content, moisture content, carbon black content, carbon black dispersion, Pigment dispersion, gas component resistance, rapid crack propagation resistance component analysis, component content detection, etc.
The comprehensive performance of pipe spool fabrication line will reach a high level in China:
1. In the detailed design, China's most advanced "Pipe Manufacturing Design System" software is used to realize the rapid drawing of the pipe spool fabrication line. After the IDF interface module is configured, the design data of the PDS and PDMS design institutes can be directly shared, so a "seamless combination" is realized between design and construction.
2. In the manufacturing management, the domestic first-class "pipe manufacturing and installation management system" software is used to realize all-round information management of the entire pipe spool fabrication line manufacturing process.
3. Pipe spool fabrication line groove adopts a reliable pipeline groove mobile workbench, two of which are used for pipe groove.
4. Roller bed type pipe plasma cutting and beveling machines have been used to cut pipes and form bevels in one step through thermal cutting and processing.
5. An efficient pipe cutting band saw machine and a fixed radial pipe end beveling machine are used to cut the pipe and machine the bevel according to the working procedure.
6. The unique mobile workstation for pipe mechanical assembly in China has been used for weld assembly to mechanically assemble pipe shaft welds.
7. Cover pipe welding adopts advanced automatic pipe welding movable workstation, pipe spool fabrication line automatic welding machine is used to realize efficient automatic cover pipe welding of pipe shaft.
8. The logistics transportation adopts the light rail transportation system, the station frame and the trolley railing system. The light rail transportation system is used for long-distance mechanical logistics transportation, and the station frame is used for transportation. The overhead railing system is used for container internal and external logistics transportation.
9. The pipe spool fabrication line project has a production capacity of 3000 inches/year and a day's production capacity of 1000 inches/day, which meets the huge engineering demand for prefabricated pipelines.
Pipe spool fabrication line has now been widely used in all aspects of people's lives, and unqualified pipes directly affect people's quality of life and health. At the beginning of 2014, some media exposed the problem of individual companies using recycled waste to produce drinking water distribution pipes and fittings, which had a bad social impact. So how to enter the site to inspect the pipe spool fabrication line?
The material, specification, model and quality of the pipe spool fabrication line and pipe fittings should meet the current national product standards and design requirements.The appearance quality of the pipe spool fabrication line should not only meet the requirements of its product standards, but also the following requirements:
l There are no defects on the surface such as cracks, shrinkage holes, slag inclusions, folding, heavy leather, and rust or dents that do not exceed the negative deviation of the wall thickness;
l The thread surface is intact without damage, and the flange sealing surface is flat, smooth, without burrs and radial grooves;
l The gasket has no aging deterioration or delamination phenomenon, and no defects such as wrinkles on the surface.
l Inspection quantity: all inspections. Check the factory inspection report and certificate.
l Inspection method: observe and inspect.
l The size, wall thickness and allowable deviation of the pipe spool fabrication line should meet its product standards and design requirements.
l Inspection Quantity: 20% of the products of each specification and model are randomly checked by the number of pieces, and no less than 1 piece
l Inspection method: measure with steel ruler and vernier caliper.
For the pipe spool fabrication line belonging to one of the following conditions, sampling shall be conducted by the supervision engineer, and the inspection and re-inspection shall be carried out by a qualified inspection unit. The re-inspection results shall meet the current national product standards and design requirements.
What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!
We currently have three types of tank jacking system, which are advanced tank jacking system, chain tank jacking system and simple tank jacking system.Advanced tank jacking system has the most advanced hydraulic jacking technology available.Today we talk about the advanced tank jacking system.
Here is the content list:
What is the working principle of advanced tank jacking system?
What are the product components of the advanced tank jacking system?
What are the construction steps of advanced tank jacking system?
Advanced tank jacking system (package unit) is evenly distributed around tank inner wall. Tank top and upper (the first layer) wall plates are lifted first and then install and weld wall plates of tank body. Self locking advanced tank jacking system and hydraulic hoist composing of lifting frame and lifting rod are adopted. When oil enters advanced tank jacking system, upper clamp fastens and lifts lifting rod and expansion ring and mobilize tank (including tank top) to ascend upward. When oil returns to jack, upper clamp returns with piston and lower clamp automatically fastens lifting rod without gliding. The jack repeats the movement and make lifting rod ascend with tank to designated height (spare height for next layer of plate). After butt weld of next layer of wall plates, open upper and lower loosening device and loosen upper and lower clamp to make lifting rod and expansion ring descend to lower expanded and welded rib plate of the next layer of wall plates and then lift. Repeat the process and ascend welded tan till the last layer of wall plates are installed and welded. The installation of the whole storage tank is completed.
1.One Module include
2.1 set x Power Pump Station: Hydraulic power supply, motor power 4KW, rated flow is about 15l/min.
3.5 sets x jacking cylinder: 25 tons rated (18 tons, 100%) (Including Hydraulic Jacking Device Components — Steel Cables, Support Device, Pull Rod, etc.)
4.5 sets x oil hoses system:One tank construction needs one jacking control system. Each jacking control system includes:
5.1 set x Electrical Controls and operating panels:
1.1 centralized PLC operation control box,
2.1 power source cabinet
With the concentrated push-button and automatic PLC control system or single-set handle operated control.
Motor and PLC are with brand of SIMENS
Main electric element are Schneider brand
Hose with USA and China JV famous brand
The following short description gives the working procedure in outline. It can in certain details be modified when required.
1.The tank bottom – plates are placed on the prepared foundation and welded together.
2.The beams or lattice work of the roof are assembled and finally joined to the upper rim of the shell ring.
3.The hydraulic jacking system is installed in the tank. The plates of the second shell ring (next to the top ring) are positioned outside the first one.
4.The completed part of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the second ring can be moved into place and the roof sheeting can be completed.
5.The plates of the second shell ring are located exactly and welded together to the lower edge of the first ring.
6.The plates of the third shell ring are placed outside the second shell ring.
7.The completed part of the tank (roof the two uppermost shell rings) is lifted.
8.The above cycle of operations is repeated until the last (bottom) shell ring is finished.
9.The entire tank is lowered down to the bottom plate and welded to this.
10.The lifting equipment is dismantled.
Above we talked about the working principle of advanced tank jacking system,equipment components and installation steps.If you need to know more, please visit our website for more information about advanced tank jacking system.
Pipeline construction equipment plays a very important role in the development and exploration of oil and gas resources. To ensure the production safety of oilfield enterprises, it is necessary to improve the quality of surface pipeline construction equipment installation and gathering pipeline construction. Next, it mainly elaborates the relevant installation points of pipeline construction equipment, analyzes and introduces the construction technology of pipeline construction equipment, and lays a solid foundation for the development of oilfield surface construction.
Here is the content list:
l Regarding the necessity of installing pipeline construction equipment.
l About the procurement and acceptance of pipeline construction equipment.
l What are the main points of pipeline construction equipment installation?
Ground construction is an important link in the pipeline development and exploration process and a key means to ensure the production safety of pipeline engineering, especially the installation of pipeline construction equipment and gathering pipeline construction technology, which plays an important role.
Production safety is closely related to the installation quality of pipeline construction equipment. At the same time, the transportation of resources has a direct impact on the construction technology of gathering pipelines. Therefore, only the continuous improvement of pipeline construction equipment installation and gathering pipeline construction technology can promote the development of resources and sustainable development.
With the continuous development and progress of my country's science and technology, my country's demand for oil and gas resources has become greater and greater. In order to promote the development of my country's economic construction and meet people's normal lives, it is necessary to strengthen management of the construction of pipeline construction equipment.
Through our analysis, it is found that the quality of products and product life of a company is closely related to the installation quality of pipeline construction equipment. Therefore, during the installation of pipeline construction equipment, the quality of pipeline construction equipment must be checked, especially the key to the equipment. Comprehensive corrosion control.
In the process of purchasing technical parts, the model, quantity, type, specifications, etc. must be carefully checked, and must comply with relevant national and corporate standards. When purchasing, try to directly sign contracts with purchasing companies to control procurement costs and ensure product quality.
Therefore, the pipeline construction equipment must meet the actual construction requirements when purchasing, and the quality of the pipeline construction equipment must be strictly controlled and accepted after entering the site. Only after all the inspections are qualified, the pipeline construction equipment can be installed on the site to ensure Safe use of equipment during construction!
During the installation of pipeline construction equipment, professional installers must perform operations. Installers must first inspect the installation site, work out a scientific and reasonable construction plan, and choose the correct installation method.
Measured according to the positioning axis of pipeline construction equipment. At present, there are two equipment installation methods that are often used in ground construction. One is to directly install on an existing building; the other is to conduct strict and precise measurement on the location of the equipment.
Check the balance error, vertical error, dimensional error, and axis error of key components in pipeline construction equipment one by one. At the same time, if you want to closely link the ground construction equipment with the construction base, you must strictly control the grouting quality of the grouting layer, and further strengthen the strength of the grouting layer. After the installation of the pipeline construction equipmentt, the safety of use must be carried out. Detect and avoid equipment failure during use, causing safety accidents, and bringing huge economic losses to the enterprise.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong