1, adjust the operation car to the welding position, if it is reverse driving to the welding position, to cross the welding arc point, and then drive in the welding direction, in order to eliminate the mechanical gap, to avoid the appearance of welding tumor, arc point in the back of the arc pit, in order to avoid welding tumor or lack of meat.
2, set the welding point, point moving "wire feed", "wire back" so that the welding wire gently contact the steel plate, using short circuit contact arc.
3. Select the "welding" position of the walking switch.
4, adjust the welding current, welding voltage (voltage slightly larger, current slightly smaller), welding speed.
5, Select the driving direction, press the corresponding "left" or "right".
6. Open the flux feeding valve, cover the flux in the welding area, move the flux control to open about "recovery", the recovery device works
7. Press the "Start" button of welding to start arc welding and adjust the welding current and welding voltage knob to the required value of welding specification.
8. Observe the position of welding bead and the forming of welding bead, adjust the welding speed and the upper and lower height of welding torch to obtain the best welding effect.
9, during the welding process, pay attention to observe the welding bead, pay attention to the obstacles ahead, welding cable to follow the situation, etc., in order to avoid driving obstacles.
10. Avoid contact with welding gun and wire feeder by hand and metal tools in welding to prevent short road accidents.
The gas-electric vertical welding used by tank welding machine is a fully automatic control ascending system with a special flux-cored wire, and CO2 gas shielding for vertical butt welding to weld vertical or near-vertical welded joints.
What is tank welding machine?
How many kinds of tank welding machine?
What is the preheating method of tank welding machine?
Large storage tank automatic welding machine, large storage tank is used to store oil, natural gas, and other energy. This kind of tank because the body is too big, cannot be formed at a time, are made of steel plate, splicing. So the welding machine is needed in the splicing process. Manual welding is the simplest and most direct method, but because of its high cost and low welding speed. So automation equipment has been widely used. Large tank automatic welding equipment, we are also known as tank automatic welding machine, the following for you to introduce several commonly used automatic welding machine: horizontal welding machine, vertical welding machine and Angle flat welding machine.
The so-called horizontal welding machine is a kind of welding machine that welds steel plates horizontally in the storage tank prefabrication.
The so-called vertical welding machine is a kind of welding machine that welds steel plates vertically in the storage tank prefabrication.
The so-called Angle flat welder is a welder that welds the bottom plate and the corners in the storage tank prefabrication.
After the arc of the welding rod of the tank welding machine is started, the arc is slightly elongated. In the state that the arc is not extinguished, the end of the welding rod is melted and a few droplets fall down. At this time, the welding rod has reached the normal burning state. At the same time, the use of the tank welding machine The heat generated by the arc heats the weld start. If it is found that the surface of the spot-fixed weld at the start of the weld begins to show signs of melting, the electrode will press the arc towards the lower edge of the spot-fixed weld, and then weld upward; The electrode reduces the welding speed slightly and turns the arc upwards. At this time, the electrode pauses for a while, and the rear edge of the weld joint is broken down in advance, and a molten pool and a molten hole are formed, and the formed molten hole must ensure that the blunt edge of both sides is 1.0~1.5 mm. At this time, the seam has been connected, and the electrode can be welded normally.
With a large number of suppliers, we can choose the right suppliers according to customers' requirements and provide the most cost-effective products. WINCOO ENGINEERING CO., LTD provides big pressure vessel, heavy duty pressure vessel, industrial pressure vessel, automatic pipeline construction equipment, electric vertical tank construction solution, etc. Complete after-sales service, we can provide online and offline technical support, not only video guidance, but also on-site guidance, want to know more about high efficiency pipeline construction equipment, horizontal pipeline construction equipment, stainless steel pressure vessel, etc.
The installation of pipeline construction equipment is one of the necessary parts in the pipe construction solution, and the installation and construction of pipeline construction equipment is a very important stage in project construction. Due to various factors in the project construction, there are many problems in the installation of pipeline construction equipment. To promote the improvement of the quality of industrial pipeline installation, certain measures need to be taken to control the installation quality of pipeline construction equipment to ensure the smooth construction of the project.
Here is the content list:
l Regarding the quality inspection of pipeline construction equipment installation.
l What are the quality control measures in the installation of pipeline construction equipment?
l Regarding the quality control of pipeline construction equipment after construction.
The sequence of installation of pipeline construction equipment is:
Measuring arrangement→cleaning the construction work area; construction road→conveying anticorrosion pipe→processing tank→distributing pipe→preparing nozzle; pipeline assembly→pipe assembly and welding→welding joint inspection→heat shrinkable casing (tape) bushing→ trench excavation →Appearance repair .
After the installation of pipeline construction equipment is completed, quality inspection is required. After pipeline construction equipment is installed and put into use, regular monitoring is required. Generally, radiographic inspection is used to inspect the quality of pipeline installation. This monitoring has a very good effect on the internal inspection of welded joints. It is widely used in the field of construction equipment installation. This method can also be used to make the quality of the pipeline meet the assessment standard.
Before installing pipeline construction equipment, clarify the construction plan of the construction technicians, use GB/T as the standard, and carry out construction in accordance with national standards and specifications; during the installation of pipeline construction equipment, strictly review the drawings for defects to ensure the rationality of the drawings, and the construction unit It is also necessary to make preparations for pipeline installation and construction, pipeline lumber, welding inspection, construction site management, etc.
Strictly follow the relevant requirements of pipeline construction equipment and pipeline construction requirements to improve the quality of construction. In order to ensure the quality of pipeline installation, quality control is required for key parts such as welding materials, welding processes, and welding seams to ensure pipeline construction equipment. Welding consumables, brands, specifications, etc. are required by the plan design, which are consistent with the project construction requirements to ensure the quality of installation.
① After the pipes, accessories and raw materials used for pipeline construction equipment enter the construction site, the supervisors shall check and accept them on site, and store the materials after passing the acceptance.
② Pipe joints and semi-finished products of pipeline construction equipment should be guaranteed not to be damaged during transportation and storage. When unloading, handle with care and not collide with each other; choose a flat place for stacking pipe joints.
③ The storage temperature of the rubber ring of pipeline construction equipment is between -5 and 30 degrees Celsius. It should not be exposed to ultraviolet light source and keep away from the heat source; the rubber ring and the items that easily affect the rubber ring should not be put together. If the pipeline construction equipment is being constructed In winter, hard rubber rings are not allowed.
④ For trench excavation in open-cut pipeline engineering, the section should meet the design requirements of construction quality, the original soil at the bottom of the trench should not be damaged, and the mechanical excavation should reserve a 200-300mm soil layer for manual excavation and leveling, and the bottom of the trench can be soaked by water And frost damage, if there is gravel soil, lime soil to backfill, the trench wall should be leveled to meet the requirements of construction design.
⑤ For concrete construction, when the pipe seat and flat foundation are poured in layers, the flat foundation should be shaved and rinsed; the concrete should be prevented from segregation, and the concrete should be cured after pouring.
⑥ When pipeline construction equipment is installed, visual inspection and internal cleanliness of the pipeline must be inspected.
⑦ The flexibility of pipe joints must meet the design requirements, and the rigidity must also meet the requirements.
⑧ In the stage of backfilling, the backfill height between both sides of the pipe and the top of the pipe before the hydraulic test of the pressure pipeline is greater than 0.5M, and the pressure-free pipeline shall be backfilled after the closed water test and the closed gas test have reached the standard.
After the completion of the pipeline construction equipment, the finishing work will begin. The unit needs to organize personnel to review the material documents involved in the pipeline installation, project reports, etc.; after the completion of the project, debugging and quality appraisal are required, and the pipeline professionals are organized to conduct quality appraisal of the installed pipelines. The dynamic control of the links will protect the completed pipelines.
In the later stage of the installation of pipeline construction equipment, in order to ensure the smooth completion of the project, the quality of the pipeline needs to be tested again to ensure that the pipeline installation does not have problems such as tilt and cracks, the welding parts are of good quality, and the pipeline is unobstructed. In the later period after the completion of the project, it is necessary to sort out each project data and work files involved in the pipeline construction, do a good job of archiving and backup to evaluate the quality of the pipeline, do a good job in risk control, and carry out the acceptance of pipeline construction equipment.
There are many influencing factors in the installation of pipeline construction equipmentt, so reasonable measures need to be taken to monitor and control every aspect of pipeline construction equipment. With the continuous expansion of the pipeline construction equipment construction industry, the use area is also expanding. Due to the importance of pipeline use, it is necessary to control the pipeline installation quality to ensure that the installation quality reaches the ideal standard!
What is more? WINCOO provide not only pipeline construction solutions, but also pipe spool fabrication solutions for customers from everywhere!
Tank hydraulic jacking system is mainly a closed or meshed hoistway enclosed by buildings or light steel structures and hydraulically driven cylinders to lift the platform.
Here is the content list:
l What are the components of installing a tank hydraulic jacking system?
l What are the performance characteristics of installing tank hydraulic jacking system?
l How to install tank hydraulic jacking system?
Tank hydraulic jacking system is mainly a closed or meshed hoistway enclosed by buildings or light steel structures and hydraulically driven cylinders to lift the platform. Its main components are:
1. Hoistway part: a closed or net-like frame enclosed by a building or light steel structure, with steel guide rails installed on both sides of the inside
2. Driving part: a small oil tank hydraulic jacking system with hydraulic components such as hydraulic driving motor, oil pump, safety valve, speed control valve and reversing valve
3. Oil cylinder part: it is composed of one or more tank hydraulic jacking system of the lifting oil cylinder straight-top platform or jacking scissor frame
4. Door system: It is a closed or net-shaped platform door or landing door system composed of steel structure. There are manual doors and automatic doors. Generally, open platforms do not have doors.
5. Electrical part: it is composed of power, control, signal, safety and lighting devices
6. Platform part: It is a steel structure platform that carries heavy objects. It has a closed type (ie car type) or an open type. Both sides are equipped with guide rollers or guide shoes. The bottom of the platform can be connected with a lifting cylinder or a lifting scissors steel frame
7. Auxiliary part: it is composed of hydraulic pipe fittings, pipelines, pressure gauges and steel structure base
8. Safety device: safety valve, limit limit, door electromechanical interlock, rupture valve, emergency switch and electrical short circuit protection, etc.
The tank hydraulic jacking system is generally equipped with safety protection devices such as anti-falling, overloading, power failure, etc., rail-type external power unit, using hanging chains or cross bars at the entrance and exit of the table, guardrails and lifting platform operating warning lights or warning bells, when the door is opened Many functions such as a safety switch to close the circuit of the elevator platform. It is extremely convenient and convenient for the operator to control multiple points in each working layer, and operate in jog or safe mode.
The large carrying capacity, stable lifting, simple and convenient installation and maintenance, and it is an economical and practical low-floor elevator to replace the ideal cargo conveying equipment. According to the installation environment and use requirements of the tank hydraulic jacking system, different fixed hydraulic jacks can be selected, and different optional configurations can be selected to complete the task of lifting objects and achieve better results.
If the tank hydraulic jacking system requires a large size, a fixed double-span hydraulic lift can be used. The double-span type has stable lifting, large carrying capacity and simple operation. It is widely used in vehicle maintenance, kilns, chemical plants, equipment supporting, etc. Industry use.
The tank hydraulic jacking system is suitable for installation and use under various environmental conditions indoors and outdoors. The tank hydraulic jacking system can be installed in a closed hoistway or between open floors, in a concave foundation pit or on a flat ground according to the requirements of use.
Due to the height of the building or work shelf, the size and weight of the objects carried, and other usage requirements, there are many uncertain factors in the tank hydraulic jacking system model. When the models shown in the list are not suitable for use requirements, the elevation, carrying capacity, platform area, etc. of the lifting platform can be combined according to the actual use environment and operating requirements to achieve the desired use effect.
What is more? WINCOO also provide customers with vairous pipeline construction solutions!
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong