Hydraulic storage tank lifting equipment consists of oil chamber, oil pump, oil storage chamber, piston, crank handle, oil valve and other main parts. When working, as long as the crank handle is moved back and forth, the manual oil pump continuously presses oil into the oil cylinder. Due to the continuous increase of the oil pressure in the oil cylinder, the piston and the weight on the piston are forced to move upward together.
What are the precautions for the use of hydraulic storage tank lifting equipment?
What are the structural parts of hydraulic storage tank lifting equipment?
What should be paid attention to before using hydraulic storage tank lifting equipment?
1. Hydraulic jacks cannot be used as permanent support equipment. For long-term support, the support part should be added under the heavy object to ensure that the hydraulic jack is not damaged.
2. If only one hydraulic storage tank lifting equipment is used to lift one end of the heavy object, the hydraulic storage tank lifting equipment should be placed on the symmetrical axis of the heavy object, and the long direction of the hydraulic jack base and the easy toppling of the heavy object should be made. the same direction. If two hydraulic jacks are used at one end of the heavy object, the direction of the base should be slightly symmetrical and placed on both sides of the symmetrical axis of the heavy object.
3. When two or more hydraulic storage tank lifting equipment are used to lift at the same time, they must be commanded, coordinated, and lifted at the same time.
4. Hydraulic storage tank lifting equipment should be stored in a dry and dust-free place. It is not suitable for use in workplaces with acid, alkali and corrosive gases, and it should not be placed outdoors in the sun and rain!
The hydraulic storage tank lifting equipment is a piston type lifting equipment, consisting of a hydraulic control cabinet (pumping station), the main bearing of the high-pressure oil pipe, the accessories of the hydraulic pump system, the oil control valve, the piston jack, the ring wire rope hanger, and the pumping station by two independent Composed of a hydraulic lifting unit and a centralized electrical control cabinet, it can serve the lifting of two 10000m³ tanks at the same time. Each 10000m³ tank is equipped with 20 jacks. The total composition of the hydraulic oil pipe is distributed in two stages, and then the hydraulic oil is sent to the hydraulic jack. Short construction period, low cost and good economic benefits are its significant advantages.
1. Before lifting, put the slotted end of the handle into the oil return valve stem, and tighten the oil return valve stem clockwise.
2. The handle of hydraulic storage tank lifting equipment is inserted into the handle hole and pressed up and down, and the piston rod will rise steadily to lift the heavy object. Due to the limiting device in the jack, it will not rise when it reaches a certain height.
3. To lower the piston of hydraulic storage tank lifting equipment, just use the slotted end of the handle to slightly loosen the oil return valve rod counterclockwise (no more than 2 turns), and the piston rod will gradually descend. If there is a load, the oil return valve stem should not rotate too fast, otherwise it will be dangerous if the descending speed is too large.
WINCOO ENGINEERING CO., LTD has committed to the research and product of hydraulic storage tank lifting equipment for several years, it will provide the best quality products.
During the use of tank welding machine, all arc welding equipment must be maintained at any time and kept in a safe working condition. When the tank welding machine has defects or safety hazards, it must be discontinued until its safety is guaranteed. Repairs must be carried out by approved personnel.
Here is the content list:
l Common problems of tank welding machine.
l What are the correct operating specifications for tank welding machine work?
l Solutions for tank welding machine maintenance and maintenance.
Common problems of tank welding machine.
l Why is the tank welding machine suitable for welding thin plates and drawn arc welding for thick plates?
1. In most cases, tank welding machine is suitable for welding on thin plates, and drawn arc stud welding is suitable for welding on thick plates.
2. Tank welding machine is characterized by high current and short time, so the molten pool is shallow and welding deformation is small.
3. But at this time, the welding strength is still relatively large (welding strength> stud strength> sheet strength, or welding strength> sheet strength> stud strength). Therefore, it is the stud or the sheet that yields first.
4. If tank welding machine is used on a thick plate, the strength of the plate itself is the greatest, because it is almost impossible to be torn, so the stud or welded joint may yield first.
5. Another reason is that tank welding machine cannot be welded on hot-rolled plates, and thick plates are hot-rolled plates in most cases.
6. The drawn arc stud welding current is relatively small, but the welding time is longer, so the molten pool is deeper and the welding deformation is larger.
7. If the deeper molten pool is welded with thin plates, it is easy to cause penetration. Generally, the mminimu plate thickness is required to be 1/4 of the stud diameter.
8. The deeper molten pool makes the welding strength always greater than the strength of the stud itself, so the stud or plate is always the first to yield in the destructive experiment.
l In the stud welder test, how to understand "the welding strength is greater than the strength of the plate and the stud itself"?
1. This sentence is mainly aimed at tank welding machine welding strength test.
2. In the destructive experiment, if the plate is torn or pulled through, and the stud welding part is still not separated from the plate, it means that the stud welding strength is greater than the strength of the plate itself.
3. If the stud is broken or bent and the welded part of the stud is still not separated from the plate, it means that the strength of the stud welding is greater than the strength of the stud itself.
What are the correct operating specifications for tank welding machine work?
l Check the connection
After completing the wiring of the tank welding machine, you must check each installed connector to confirm that it is well connected before starting to operate the equipment. Its contents include:
l leakage
There must not be any leakage of cooling water, shielding gas or engine oil that affects the safety of welders.
l Work suspension
When the welding work is suspended (for example, during breaks), the output terminal of the equipment or welding machine must be turned off or the power supply must be cut off.
l Mobile welding machine
When you need to move the tank welding machine, you must first cut off the power supply at its input end.
l Equipment not used
The metal electrode and carbon electrode must be removed from the welding tongs when not in use to eliminate the risk of electric shock to personnel or conductive objects. The welding tongs must be placed out of contact with persons, electrical conductors, flammable objects or compressed air bottles when not in use. The welding torch of the tank welding machine must be properly placed when not in use to avoid accidental activation of the gun body switch.
l maintain
All arc welding equipment must be maintained at any time and kept in a safe worki
Solutions for tank welding machine maintenance and maintenance.
For the tank welding machine construction solution, the following brief description outlines the work process. If the tank welding machine needs repair and maintenance, it can be modified in some details as needed.
Step 1. Place the tank bottom-plate on the prepared foundation and weld it together.
Step 2. Assemble the beam or trellis of the roof, and finally connect it to it.
We have the ability to provide feasible solutions for tank welding machine construction solutions, electric vertical storage tank construction solutions, CNC vertical storage tank construction solutions, electrical vertical storage tank construction solutions, and horizontal vertical storage tank construction solutions. Solutions to support customers in shortening project execution time, reducing man-hour costs during the project bidding phase, improving construction efficiency, and improving quality!
The application of steel in engineering, construction and life is more and more, and most of the time it needs steel of various shapes, such as rectangle, round, or other shapes. At this time, professional steel cutting machines are needed. Today we introduce to you is dedicated to the factory cutting machine.
●CNC Flame Cutting Machine
●CNC flame & plasma cutting machine
●CG Multi-head strip cutting machine
●XCF-1200 portable digital control flame cutting machine
Standard configuration is 2 CNC cutting torches and 9 strip cutting torches, also can special design according to customers’ requirements. With auto-ignition,auto-lifting,auto-piercing,auto-cutting,powder-spay,printing,cooling with water, re-cutting, dynamic graphic-tracing display, auto-height control for torch as options. Closed loop control for servo system. No clearance transmission for gear and gap, and with automatic acceleration and deceleration, cutting sequential control, art parameters set-up and kerf - compensation function.
CNC flame & plasma cutting machine is a kind of high-efficient and high-precise multi-head cutting and transverse straight-end cutting, and it also can do other geometric shape cutting. The gantry type structure design can ensure the high strength and rigidity. It equipped with Japanese Panasonic full-digital AC servo driving system and German Neugart reducer, it runs steadily and cutting with a high precision.
This kind of machine is adopting oxygen gas supply with high efficiency; it can be designed with different number of cutting torches according to customer’s requirement. It can process several plants in one time, with the function of longitudinal multi-head cutting and transverse straight-end cutting. Equipped with imported transducer to stepless speed adjustment, the adjustment range is large and it can move safety.AC frequency conversion governor or AC servo is adopted in driving system.
XCF-1200 can cut not only manually as a semi-automatic car but also automatically. It is the portable type when the cutting range is within 1200mm.It likes the gantry type digital control cutter to cut any complex plane figure. It is mainly used for flame cutting as well as may be configured the plasma cutting. The vertical guide of the main machine adapts the imported precision double axis straight line guide; the horizontal guide is made of the precision transmission system and the aluminum alloy sections with stable transmission and high precision. The CNC control system which is produced by Sino-US joint venture has the advantages of high reliability and strong anti-jamming, it is easy to master jacking programming. It can do either the manual programming for the simple figure or the automatic jacking programming for the complex figures.5.7 inches LCD, so it is visual and easy to learn. The machine is widely applied to plate-cutting of manufacturing industry such as automobile, shipbuilding, engineering machinery, petrochemical industry and pressure vessel etc.
The above is our WINCOO several cutting machine types, the specific product content welcome you to enter our website to browse.
Hydraulic tank jacks is widely used in China for jacking in various situations.Today we are going to focus on the hydraulic tank jacks for tank jacking.
Hydraulic tank jacks is an important machine for tank construction. The equipment is mainly used for inverted construction of vertical cylindrical steel tank (hydraulic lifting method) in petrochemical industry, inverted construction of steel liner in power plant chimney and inverted construction of vertical cylindrical low temperature tank.
At present, we have three types of hydraulic tank jacks in WINCOO Engineering Co., LTD. They are the following three: Advanced hydraulic jacking system, Simple unfixing Holding -latch hydraulic Jacking system and Simple chain type hydraulic jacking system.
At present, there are six construction methods of large storage tank construction: hydraulic jack, central column, floating, forward loading, mechanical jacking. Hydraulic tank jacks is the most widely used one, which is characterized by wide adaptability and can theoretically be applied to any size tank;The operation control is simple, reliable and less threatening.So it is adopted by more and more people.Hydraulic tank jacks is an important part of hydraulic jacking system.
As one of the most comprehensive hydraulic tank jacks production and sales companies in China, we can produce hydraulic tank jacks suitable for you according to the specific needs of customers.Whether it is oil tank, gas tank, sugar tank, granary, etc., we have suitable hydraulic tank jacks.
Sign up for our newsletter to receive the latest news.
Copyright © 2020 WINCOO ENGINEERING CO.,LTD
Support By:Leadong